Similar Projects
Better Market Street - Phase 1
Infrastructure
Bidding
$24,000,000 est. value
San Francisco, CA 94158

Citywide Water Line Replacement
Infrastructure
Bidding
$5,853,200 est. value
Sunnyvale, CA

Valve Inspection Maintenance and Repair Services
Term Contract, Alteration
Post-Bid
Santa Clara, CA

Professional Engineering Services For Water System Improvements In Madera County Maintenance District No. 36 Eastin Arcola
Infrastructure
Post-Bid
Madera, CA

8-Inch and 12-Inch Ductile Iron Water Main Replacement
Infrastructure
Results
$7,500,000 to $9,000,000 est. value
San Francisco, CA

Renovation of the Existing Underground Steam Distribution System
Infrastructure
Results
$13,222,600 est. value
Yountville, CA 94599

Industrial Streets (Phase I) Water & Sewer Main Improvements
Infrastructure
Bidding
$4,000,000 est. value
Santa Ana, CA 92701

Locating Subsurface Facilities
Alteration
Post-Bid
Riverside, CA 92519

Hydronic Valve Replacement
Infrastructure
Results
Channel Islands Beach, CA

Backflow Testing and Emergency Repairs
Infrastructure
Bidding
Modesto, CA 95354

Water System Repair
Alteration
Post-Bid
Placerville, CA 95667

North Long Beach Collection Main Control Valve Upgrade
Infrastructure
Results
$1,116,000 est. value
Long Beach, CA 90899

Water and Sewer CIP Project
Infrastructure
Bidding
Rio Vista, CA

Victorville Water District Meter Endpoints
Alteration
Post-Bid
Victorville, CA

3rd Street, Buena Mesa Drive, and Calimesa Boulevard 24" Recycled Water Pipeline
Infrastructure
Results
$4,000,000 to $6,000,000 est. value
Calimesa, Yucaipa, CA 92399

Reported 12/01/2021 12:00 AM
Project Title

Water Main Capital Improvement

Physical Address View project details and contacts
City, State (County) Vallejo, CA 94589   (Solano County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $1,500,000 to $2,000,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of approximately 50 lineal feet of 4” PVC; 75 lineal feet of 6” PVC; 1,300 lineal feet of 8” PVC, 20-8” gate valves, 16-12” butterfly valves, 80-1” water service reconnections, 11 fire hydrant assemblies; including tie-ins, reconnections, miscellaneous fittings, paving, and all other work and facilities necessary or incidental to construct the completed improvement

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents