Similar Projects
New High School - Wellen Park
New Construction - 325,000 SF
Conception
$120,000,000 est. value
Sarasota, FL

Fruitville Building 5 Renovation
Renovation
Conception
$2,750,000 est. value
Sarasota, FL

Historic Miramar Innovation and Technology Village
Design
Miramar, FL 33025

Yulee High School Classroom Addition
Addition
Design
Less than $6,250,000 est. value
Yulee, FL 32097

Apollo Middle School - Smart Program Renovations
Renovation
Bidding
$6,300,000 est. value
Hollywood, FL 33024

Construction Manager at Risk - CMAR Services for Historic Roosevelt Full Service Center - Modernization
New Construction, Renovation - 20,000 SF
Bidding
$7,441,382 est. value
West Palm Beach, FL 33407

Frostproof Middle School Senior Baseball Locker Room / Fieldhouse
New Construction
Sub-Bidding
$2,000,000 est. value
Frostproof, FL 33843

Bozeman School Addition - Field, and Site Work Phase 1
Addition, Infrastructure
Sub-Bidding
$350,000 est. value
Panama City, FL 32409

George Washington Carver Middle School Renovations
Post-Bid
Less than $2,799,203 est. value
Coral Gables, FL 33133

Fairview Middle School Site Improvements - Phase 5C
Post-Bid
Tallahassee, FL 32305

Dr. Toni Bilbao Preparatory Academy Phase II Addition of Middle School Grades 6-8
Addition
Results
Less than $8,459,271 est. value
Doral, FL 33178

Construction Management (CM) Services
Results
FL

The Pine School
Addition - 22,369 SF
Construction
$6,800,000 est. value
Hobe Sound, FL 33455

Rickards High School New Construction, Remodeling, Renovations and Site Improvements Project
New Construction
Construction
Less than $30,000,000 est. value
Tallahassee, FL 32301

Baker Middle School Cafeteria & Kitchen Facility
New Construction, Addition - 5,000 SF
Pending Verification
Macclenny, FL 32063

Last Updated 06/27/2022 08:20 AM
Project Title

New Freeport Middle School - CM Services at Risk

Physical Address View project details and contacts
City, State (County) Freeport, FL 32439   (Walton County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids. Construction Management - CM at Risk.
Project Status Construction Documents
Bids Due View project details and contacts
Estimated Value $55,621,014
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Include pre-construction, design input, and construction services for the project. EMI Architects is the design lead firm for the project. Property is located in Freeport, Florida

Details

Middle/Senior High School, New Construction.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents