Similar Projects
Chemical Treatment of Deep Wells
Bidding
East Saint Louis, IL

Chemical Treatment of Deep Wells
Bidding
East Saint Louis, IL

Submersible Explosion Proof Pumps
Post-Bid
Wheaton, IL 60187

Replacement OEM Moyno Pump Parts
Term Contract
Post-Bid
Waukegan, IL 60085

Phase 2 Installation of Monitoring Wells and Probes
Renovation
Results
Hanover Park, IL 60133

Northwest Waterworks Booster Pump VFD Installation and South Operations Center Pump VFD Replacement
Results
Naperville, IL 60540

Well No. 21 (Division A)
Bidding
Normal, IL

Pumping Equipment Repair and Maintenance Services
Term Contract
Post-Bid
Naperville, IL 60540

Barrington HS Sewage Ejector Pump Replacement
Results
Barrington, IL 60010

Well No. 21 (Division B)
Bidding
Normal, IL

Engineering, Design, and Construction Services for New Deep Well #19
Post-Bid
Crystal Lake, IL

Well and Well House No. 3
Results
Less than $1,602,700 est. value
Pecatonica, IL 61063

Well 6 Repairs
Bidding
Antioch, IL

East Stl Bp 12 Phase 1 Relief Wells
Post-Bid
$10,000,000 to $15,000,000 est. value
Madison, IL

183 CES Repair Boilers & Pumps P-48
Results
$100,000 to $250,000 est. value
Springfield, IL 62707

Last Updated 06/29/2020 12:57 PM
Project Title

Improvements to City Well Number 31

Physical Address View project details and contacts
City, State (County) Naperville, IL 60540   (DuPage County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing a new submersible motor, new column pipe and cabling for Well Number 31; refit of Well No. 31 pump; and successful return to service Well Number 31; and all associated piping. Additional work includes replacement of gas chlorination system equipment for Well NUmber 31, NWWW Reservoir and DWC Supply with new gas chlorination system and chlorine scrubbers; SCADA improvements; replacement of piping in Well Number 31 meter vaults; and painting.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents