Similar Projects
Forty-Yard Waste Disposal Containers
Infrastructure
Bidding
Dallas, PA

Collection and Disposal Services
Post-Bid
Wilkes-Barre, PA 18702

Refuse Collection and Recycling Services
Term Contract
Post-Bid
Laflin, PA 18702

Snow and Ice removal Hazelton, PA
Results
Hazleton, PA 18201

Refuse and Recycling Collection and Disposal Services
Infrastructure
Results
Wyoming, PA

Collection of Garbage, Trash and Recycling
Post-Bid
Harveys Lake, PA 18618

PA Career Link Snow Removal
Term Contract
Post-Bid
Hazleton, PA 18201

Hauling Bid
Post-Bid
Hunlock Creek, PA 18621

Waste Tire Recycling
Post-Bid
Wilkes-Barre, PA

Trash Removal Services at the Social Security Admin
Post-Bid
Wilkes-Barre, PA

Road-Killed Deer Removal and Disposal
Post-Bid

Collection and Disposal Services for Municipal Solid Waste and Recycling
Infrastructure
Post-Bid
Ashley, PA

Elk State Forest Timber Stumpage Sale
Infrastructure
Post-Bid
Austin, PA 16720

Curbside Collection of Municipal Waste and Recyclable Materials
Infrastructure
Post-Bid
Plymouth, PA

Trash and Garbage Hauling
Term Contract
Post-Bid
Hazleton, PA

Reported 03/15/2022 12:00 AM
Project Title

Coal Creek Diversion Channel Debris Removal

Physical Address View project details and contacts
City, State (County) Plymouth, PA   (Luzerne County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

For the operation and maintenance of the 16-mile Wyoming Valley Flood Risk Management Project, Luzerne County, Pennsylvania. The Coal Creek Diversion Channel, located in Plymouth Borough, is a component of that system. Tropical Depression Ida in September 2021 caused flooding along Coal Creek within Plymouth Borough. The storm deposited debris consisting of cobbles, rocks, and sediments through the channel which eventually collected in the box culvert and settling basin sections of the concrete structure. The Work consists of, but is not limited to, mobilization to the site. removal of all existing cobbles/rocks/sediment debris from the box culvert and settling basin components of the concrete structure, hauling of the debris to the disposal site, restoration of the earthen embankment adjacent to the structure as applicable, and de-mobilization.

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents