Similar Projects
West Campus Chilled Water Plant System Expansion (Design Assist-Mechnical)
Post-Bid
University Park, PA

Chilled Water Piping Installation in Walker Tunnel
Post-Bid
University Park, PA

Science Rooms Renovation - HVAC Construction
Results
$75,000 est. value
Philipsburg, PA 16866

Cooling Tower Replacement at Bellefonte Middle School
Results
Bellefonte, PA 16823

Walker Building HVAC Upgrades
Construction
University Park, PA 16802

HVAC and Mechanical Products
Term Contract
Post-Bid

Daikin Chiller Inspection/Maintenance/Repair
Term Contract
Results
Bellefonte, PA 16823

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Nature Inn - Moisture Remediation - Bald Eagle State Park
Results
$100,000 to $500,000 est. value
PA

Construction of a New 2,570 SQFT Interior Office Renovation - Mechanical Construction (Including HVAC and Plumbing)
Alteration
Post-Bid
Bellefonte, PA 16823

HVAC Work
Alteration
Results
State College, PA 16801

PSU - Grange Building HVAC Upgrades
Alteration
Post-Bid
State College, University Park, PA 16801

Stadium Improvement at the Penns Valley Stadium - HVAC Construction
Alteration
Results
Spring Mills, PA 16875

HVAC & Refrigeration Replacement & Maintenance For Lukoil Service Stations
Alteration
Post-Bid

HVAC Work
Alteration
Results
State College, PA 16801

Last Updated 12/09/2021 08:36 AM
Project Title

HVAC Work

Physical Address View project details and contacts
City, State (County) State College, PA 16801   (Centre County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Furnace - Service: 1. Have a furnace technician service the furnace. 2. Replace air filters in furnace. 3. Visually inspect all other components of furnace for existing or future problems. 4. After cleaning and preliminary adjustments, furnace is to have final adjustments made for peak efficiency with a combustion analyzer. These readings are to be recorded and left at furnace for future reference. 5. Any component found defective or in need of possible replacement (with the exception of items mentioned above) must be reported to the rehabilitation specialist along with associated costs for possible replacement. This will be covered in a change order. 6. Provide copy of technical report to Owner and Rehabilitation Specialist. Water Heater Replace: Install a new Energy Star Rated Heat Pump water heater manufactured by Bradford White RE2H50S10 or approved equal. 2. Remove existing gas water heater from basement and dispose of properly. 3. Install the new Heat Pump water heater on a 4” high stable base. 4. Connection to existing plumbing is to be done with PEX and include shut-off valves. 5. Include all accessories necessary to complete the job in a code compliant manor

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents