Similar Projects
Grand Portage Generator Replacement at the Border Station - (Highway 61 North)
Bidding
Duluth, MN

Saint Croix State Park New Shower Building - Subcontractor Bidding
Bidding
$1,514,203 est. value
Hinckley, MN 55037

Fairfax Municipal Utilities 3750/5250 Kva Transformer
Post-Bid
Fairfax, MN 55332

Health and Human Services Building Generator Addition
Post-Bid
Red Wing, MN

Zachary Lane Elementary School - 2021 LTFM
Renovation
Results
Less than $1,200,000 est. value
Minneapolis, MN 55442

Sauk Rapids Rice HS Lighting Upgrades
Results
Sauk Rapids, MN 56379

Electrical Meters for MN Department of Veterans Affairs
Bidding
$68,000 est. value
Hastings, MN 55033

Switchgear Maintenance at Retirement Building
Term Contract
Post-Bid
Less than $15,000 est. value
Saint Paul, MN 55103

059--Uninterrupted Power Supply (UPS) Service and Maintenance
Results
Minneapolis, MN

Electrical Meters for MN Department of Veterans Affairs
Bidding
$112,690 est. value
Minneapolis, MN 55417

Energy Services
Post-Bid
Long Lake, MN

Replacement Emergency Generator for Kenny School and Olson School
Results
Minneapolis, MN 55419

Holiday Inn Steam to Hot Water Building Conversions - Phase 3 Group C - Electrical
Renovation
Bidding
Duluth, MN 55802

DNR R4 Banning SP EV Charging Station
Post-Bid
Sandstone, MN

Sandy Lake Dam Network Conduit Installation
Results
Less than $25,000 est. value
McGregor, MN 55760

Last Updated 04/15/2021 01:31 PM
Project Title

Glenwood Area Office Storage Building- Electrical

Physical Address View project details and contacts
City, State (County) Glenwood, MN   (Pope County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $32,925
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A. The work will be done under one prime contract that includes: Electrical construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Construct a new post-frame storage building including related equipment, appurtenances, electrical utility installations, and other Work indicated in the Contract Documents. Alternate 1: Extend all building elements 6’-0” to grid ‘F’ as shown in contract documents and drawings.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents