Similar Projects
SR 524/Olympic Ave Vic To 48th Ave W Vic - ADA Compliance
Infrastructure
Design
$2,296,000 est. value
WA

SR 530 / 59th Ave NE and 211th Pl NE - Intersection Improvements
Infrastructure
Design
$1,549,000 est. value
Arlington, WA 98223

I-405, NE 85th Street Interchange and Inline BRT Station Project
Term Contract
Bidding
$210,000 est. value

PWC - 236 th St. Conduit Installation and I-5 Bridge Crossing (Re-Bid)
Infrastructure
Bidding
$800,000 CJ est. value
Mountlake Terrace, WA 98043

Darrington Compound Fence Install
Infrastructure
Sub-Bidding
$100,000 CJ est. value
Darrington, WA 98241

Operations Center Transformer Access Walkway
Term Contract
Sub-Bidding
$75,000 CJ est. value
Everett, WA 98201

Tower Site Readiness Phase II Project
Infrastructure
Post-Bid
Camano Island, Darrington, Everett, Kingston, Marysville, Mountlake Terrace, WA 98208

8th Street Improvements Project
Alteration
Post-Bid
$739,767 est. value
Marysville, WA

Nugget Park Sidewalk Replacement
Infrastructure
Results
$275,000 to $350,000 est. value
Brier, WA 98036

Harbour Reach Drive Improvements
Infrastructure
Results
$915,224 est. value
Mukilteo, WA 98275

SR 99/Lincoln Way Vic to Evergreen Way - ADA Compliance
Infrastructure
Design
$969,000 CJ est. value
Everett, WA 98208

SR 526/Airport Rd to E Casino Rd - Seismic Retrofit
Infrastructure, Renovation
Bidding
$7,000,000 CJ est. value
Everett, WA 98208

Whitehorse Trail Improvements
Renovation, Alteration
Post-Bid
WA

Fisherman's Harbor Commercial Development Parcels A8 & A17
New Construction, Infrastructure, Alteration - 6,000 SF
Results
$4,300,000 to $4,700,000 est. value
Everett, WA 98213

SR 531/43rd Ave NE to 67th Ave NE - Widening
Infrastructure
Design
$29,204,000 CJ est. value
Marysville, WA 98271

Last Updated 07/25/2022 04:01 PM
Project Title

Scriber Creek Trail Phase 2

Physical Address View project details and contacts
City, State (County) Lynnwood, WA 98036   (Snohomish County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $7,982,674 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Thus Contract provides for improvement of Scriber Creek Trail Phase 2, which runs from north of 200th St SW to the south west corner of Lynnwood Transit Center. The work includes but not limited to construction of approximately 0.4 miles of 10 to 12-foot- wide paved trail with gravel shoulders, 910 feet of elevated boardwalk structure, cement concrete sidewalk, curb ramps, curb and gutter, stormwater conveyance system, concrete driveway crossings, erosion control, site preparation, grading, utility adjustments/ relocation, roadway channelization striping, pavement markings, trail ammenities, permanent signage, signal system modification at the intersection of 200th St SW/Cedar Valley RD and other electrical appurtenances including service cabinet, signal controller, electrical lines and junction boxes, ilumination system, wetland mitigation planting, traffic control, and other miscellaneous work. AIL Bids shall be based upon comphance with the Project Manual inccluding, without limtation, the Contract Plans and Specifications). The estimated cost range for this project is ($5,800,000 to $6,500,000). The project shall be Physically Completed within in 365 working days of the Notice to Proceed. All questions regarding this Project shall be addressed to Monica Thompson, Project Manager, at mthompson@lynnwoodwa.gov. The City expressly reserves the right to reject any or ail Bids, to waive irregularities, and to award the project to the lowest responsive, responsible Bidder. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents