Last Updated | 12/28/2022 03:04 PM |
Project Title | Beechwood Chemical Feed Improvements |
Physical Address | View project details and contacts |
City, State (County) | Lake Jackson, TX 77566 (Brazoria County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected January 2023 |
Bids Due | View project details and contacts |
Estimated Value | $908,446 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project will include construction of a new chemical building to house chemicals, a chlorine gas system, a chlorine injection system and controls, and liquid ammonia sulfate (LAS) injection system and controls, with injection lines to the raw water header and emergency and safety equipment. a. The proposed chemical building structure, coatings, schedules, and appurtenances necessary for a complete building will be constructed in accordance with the WGA Drawings and Specifications included in the Bid Set. b. The proposed chemical building appurtenances, including the lighting, fans, heater, emergency and safety equipment, liquid chemical tanks, chemical containment, and metering pumps, and associated equipment will be constructed in accordance with the WGA Drawings and Specifications included in the Bid Set. c. The proposed chlorine injection system and equipment in the proposed building will be constructed in accordance with the HR Green Drawings and Specifications included in the Bid Set. d. The proposed electrical power, instrumentation, and control for equipment in Item b. and c. in the proposed building, as well as site power and control conduits and ductbanks, will be constructed in accordance with the HR Green Drawings and Specifications included in the Bid Set. e. The proposed chlorine and LAS injection line and work at the raw water header will be constructed in accordance with the HR Green Drawings and Specifications included in the Bid Set. f. Proposed building site civil features will be constructed in accordance with the WGA Drawings as modified in the HR Green Drawings included in the Bid Set. Any project questions should be posted electronically. Bid Bond or Cashier's Check. Do not include any other documents please. Question Deadline 12/07/2022 at 10:00 AM CT Completion Date: 180 Calendar Days |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |