Similar Projects
Baptist Health Emergency Room Expansion - Van Buren
Addition, Infrastructure
Conception
$10,000,000 CJ est. value
Van Buren, AR 72956

8th Street Commercial Buildings
New Construction, Infrastructure
Conception
$5,800,000 CJ est. value
Rogers, AR 72758

Sultana Museum and Interpretive Exhibits
Renovation, Infrastructure - 23,000 SF
Design
$400,000 CJ est. value
Marion, AR 72364

Rogers Ped. Impts. (TAP-19) (S)
Infrastructure
Design
$500,000 CJ est. value
Rogers, AR 72756

Runway 18-36 Widening
Infrastructure
Bidding
$2,600,000 CJ est. value
Bentonville, AR 72712

Walmart Campus Hotel (NEO Hotel) and Welcome Center
New Construction, Infrastructure - 3,000 SF
Bidding
$55,000,000 CJ est. value
Bentonville, AR 72712

Rogers Elementary #17
New Construction, Infrastructure - 86,454 SF
Sub-Bidding
$20,000,000 CJ est. value
Rogers, AR 72756

Repairs and Improvements to the Jacob Wolf House Historic Site
Infrastructure
Post-Bid
Norfork, AR 72658

Wastewater System Improvements - Contract Section I (Collection System)
New Construction, Infrastructure
Post-Bid
Alpena, AR

New Walking / Biking Trail on the Campus of ASU-MTN
Results
Mountain Home, AR

Wastewater System Improvements
Infrastructure
Results
Lake City, AR

McReynolds Recreational Vehicle Park
New Construction
Construction
Siloam Springs, AR 72761

SW 4th and B Street Townhomes
New Construction, Infrastructure - 10,451 SF
Construction
$2,000,000 CJ est. value
Bentonville, AR 72712

Hogan Lane Absolute Storage
New Construction, Infrastructure - 50,000 SF
Pending Verification
$4,000,000 CJ est. value
Conway, AR 72034

East Central Avenue Hotel
New Construction, Infrastructure - 116,473 SF
Pending Verification
$35,000,000 CJ est. value
Bentonville, AR 72712

Last Updated 11/15/2022 05:01 PM
Project Title

PBWU Hwy 65 Utility Relocation

Physical Address View project details and contacts
City, State (County) Pine Bluff, AR 71601   (Jefferson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $26,745 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

For any questions concerning Contractors Licensing Requirements contact the State Licensing Board at (501) 372-4661. The Pine Bluff Wastewater Utility will receive bids on a General Contract to extend existing steel encasement until it meets the new proposed R/W. Bids shall be on a unit price basis. Pursuant to Ark. Code Ann. 22-9-203, the Owner encourages all small, minority, and women business enterprises to submit bids for capital improvements. Encouragement is also made to all general contractors that in the event they subcontract portions of their work, consideration is given to the identified groups. Each Bid must be submitted on the prescribed form and accompanied by a certified check or bid bond executed on the prescribed form, payable to The Pine Bluff Wastewater Utility in an amount not less than 5 percent of the amount bid. The bid proposal and work of the proposed contract shall be in accordance with all applicable federal, state, county, and local laws, ordinances and regulations. For information concerning the proposed Work, contact Montrell Plummer at the Engineer's office. The attention of the Bidder is directed to the applicable federal and state requirements and conditions of employment to be observed and minimum wage rates to be paid under this contract. Any Bid may be rejected which contains material omissions, or irregularities, or in which any of the unit prices are obviously unbalanced in the opinion of the Owner. Also, a bid may be rejected if it, in any manner, shall fail to conform to the conditions of the Bidding Requirements and Contract Documents. The Owner reserves the right to waive irregularities, reject bids, choose the most qualified bidder for the Project, and to postpone award of the Contract for a period of time which shall not exceed beyond 90 days from the bid opening date.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents