Similar Projects
Last Updated | 04/06/2022 11:56 AM |
Project Title | Zorinsky Tree Removal Phase 2 |
Physical Address | View project details and contacts |
City, State (County) | Omaha, NE (Douglas County) |
Category(s) | Heavy and Highway, Single Trades |
Sub-Category(s) | Hauling, Landscaping/Irrigation |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work includes creating a 30 foot wide firebreak zone around the perimeter of the Papio Creek Dam Site 18 – Lake Zorinsky government fee property line. The firebreak zone consists of an area clear of all trees, woody vegetation, underbrush and potential fuel for forest fires a minimum of 30 foot wide along the property line and a minimum 30 foot high canopy. All trees 6 inches in diameter and larger are required to be removed a minimum of 6 inches below existing ground surface by saw cutting, stump grinder, root ball removal, or other methods. Smaller woody vegetation shall be cut at the ground surface. All tree stumps and cut woody vegetation shall be treated with an appropriate herbicide for woody vegetation in accordance with Federal, State and Local laws. The firebreak zone shall be cleared of all remnant debris, prepared and seeded. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |