Similar Projects
Last Updated | 02/09/2023 11:04 PM |
Project Title | WWTP Baffle Wall Replacement |
Physical Address | View project details and contacts |
City, State (County) | Plymouth, MA 02360 (Plymouth County) |
Category(s) | Single Trades |
Sub-Category(s) | Plumbing |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $375,000 [brand] Estimate |
Plans Available from | Agency's Affiliate - 08/25/22 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | All labor, materials, equipment, services and construction necessary to replace the Wastewater Treatment Plant Chlorine Contact Tank Baffle Walls. PROJECT DESCRIPTION A. The Project is generally described as the Plymouth WWTP Chlorine Contact Tank Baffle Wall Replacement Project. The Work Site includes the Plymouth Wastewater Treatment Plant located at 131 Camelot Drive, Plymouth, Massachusetts. This work will primarily be conducted in and around the chlorine contact tank towards the north end of the plant. A. The Work includes labor, material and equipment, services required for construction, testing, and commissioning of the Project in accordance with the Contract Documents ad as more specifically described in the Specifications and Drawings and includes, but is not limited to, the following principal features. B. The Base Bid includes the work described below for Chlorine Contact Tank 704B (Tank #2): 1. Demolition and legal disposal of existing baffle walls in the chlorine contact tank (02 41 19 Selective Demolition). 2. Repair of chlorine contact tank concrete from demolition process (03 01 05 Concrete Repair). 3. Furnish and install new baffle walls into the existing chlorine contact tank (06 82 00 Fiberglass Baffle Wall). a. Provide Submittals b. Contractor shall be responsible for field verifying all measurements and 7dimensions prior to bidding. 4. Limited cleaning as required for work. 5. Provide all materials, equipment, services, and construction inherent to the Work. C. The Bid Alternate includes all work described in Items 1 through 5 in Section 1.03(B) for Chlorine Contact Tank 704A (Tank #1). |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |