Similar Projects
2021 Utility Reconstruction
Bidding
Crystal, MN

Avery Park Utility and Street Improvements
Bidding
$2,360,000 est. value
Maple Grove, MN

Ground Thawing Services
Term Contract
Post-Bid
Less than $175,000 est. value
Minneapolis, MN

2021 Infrastructure Improvements
Post-Bid
$1,500,000 to $2,000,000 est. value
MN

Ridgedale Drive Watermain Replacement
Results
Minnetonka, MN 55305

Brookdale Park Neighborhood Reconstruction
Results
Less than $5,900,000 est. value
Brooklyn Park, MN 55444

Brooklyn Boulevard (CSAH 152) Reconstruction
Bidding
$10,000,000 to $13,000,000 est. value
Brooklyn Center, MN

Ductile Iron Pipe
Term Contract
Post-Bid
Minneapolis, MN

2021 Street Reconstruction Project Grading, Base, Bituminous Surfacing, Concrete Curb and Gutter, Storm Sewer and Water Main
Results
Less than $4,600,000 est. value
Plymouth, MN

Watermain Improvements Phase 1
Bidding
Mound, MN

Grandview South Area Street and Utility Improvements Improvement
Post-Bid
$9,000,000 to $10,000,000 est. value
Brooklyn Center, MN

Phase 4 Street and Utility
Results
Minneapolis, MN

2021 Street Surface Improvements
Bidding
Hopkins, MN

Monterey Drive, Beltline Boulevard and 36th Street Reconstruction
Post-Bid
Saint Louis Park, MN 55416

Opus Area Improvements Phase 2
Results
Minnetonka, MN

Last Updated 11/06/2020 12:30 AM
Project Title

Meter Station M228A, Interceptor 7015C, and L35 Repair

Physical Address View project details and contacts
City, State (County) Brooklyn Park, Maple Grove, MN 55101   (Hennepin County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of the existing Meter Station in Brooklyn Park, MN and Sliplining a segment of interceptor 9000416 in Maple Grove,MN

Details

Lift and Pump Stations, Renovation.
Division 01 - General Requirements, Site Construction Performance Requirements, Site Preparation Performance Requirements.
Division 02 - Existing Conditions, Demolition.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Structural Panels, Composite Paneling, Fiberglass Reinforced Paneling.
Division 09 - Finishes, Painting.
Division 22 - Plumbing, Plumbing Piping.
Division 26 - Electrical, Common Work Results for Electrical, Instrumentation and Control for Electrical Systems, Substations, Power Distribution Units, Transfer Switches.
Division 31 - Earthwork, Common Work Results for Earthwork, Geosynthetics for Earthwork, Clearing and Grubbing, Grading, Excavation and Fill, Tunnel Grouting.
Division 32 - Exterior Improvements, Base Courses, Aggregate Base Courses, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting Accessories, Landscape Surfacing.
Division 33 - Utilities, Common Work Results for Utilities, Trenchless Utility Installation, Microtunneling, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Site Grounding.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents