Similar Projects
Hoit Road/Whitney Road Intersection Signalization - #30 - City of Concord
Infrastructure
Conception
$474,791 CJ est. value
Concord, NH 03301

Manchester Street/Route 3 South - #36 - City of Concord
Infrastructure
Conception
$7,765,000 CJ est. value
Concord, NH 03301

Penacook Riverfront Parks - #567 - City of Concord
New Construction, Infrastructure
Design
$1,747,729 CJ est. value
Concord, NH 03301

River Road Warehouse and Cold Storage
New Construction, Infrastructure - 11,250 SF
Design
$1,200,000 CJ est. value
Bow, NH 03304

Trenchless Pipe Lining Services
Infrastructure
Bidding
$50,000 CJ est. value
Boscawen, NH 03303

Supply and Install of Water Lines and Pipes
Infrastructure
Post-Bid
$200,000 CJ est. value
Concord, NH 03301

Spaulding Academy School Expansion
Addition, Demolition, Renovation, Infrastructure - 39,723 SF
Post-Bid
$800,000 CJ est. value
Northfield, NH 03276

ECTC Site Improvements
Infrastructure
Results
$2,663,280 est. value
Pembroke, NH 03275

Concrete Sealant Removal and Disposal, Blackwater Dam, Webster, NH
Infrastructure
Results
$100,000 to $250,000 est. value
Webster, NH

Concord - WWTF (Waste Water Treatment Facility) Secondary Clarifiers
Renovation, Infrastructure
Construction
$3,100,000 CJ est. value
Concord, NH 03301

Granite Woods Distribution Center
New Construction, Infrastructure - 500,000 SF
Construction
$54,000,000 CJ est. value
Hooksett, NH 03106

Clark Heintz Expansion
New Construction, Infrastructure - 10,000 SF
Pending Verification
$1,000,000 CJ est. value
Bow, NH 03304

Thibeault Drive Warehouse
New Construction, Infrastructure - 10,000 SF
Pending Verification
$2,000,000 CJ est. value
Bow, NH 03304

Broadway/West Street Intersection (McKee Square) Signalization - #31 - City of Concord
Infrastructure
Conception
$6,150,000 CJ est. value
Concord, NH 03301

Damon Insulation Expansion
New Construction, Infrastructure - 5,550 SF
Design
$600,000 CJ est. value
Bow, NH 03304

Last Updated 06/22/2023 12:34 AM
Project Title

Piston Ring Replacement, Hydraulic Gates, Blackwater Dam

Physical Address View project details and contacts
City, State (County) Webster, NH 03303   (Merrimack County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Goals for minority participation for each trade 3.6% Goals for female participation for each trade 6.9% THE WORK CONSISTS OF: The goal of this project is to minimize the ongoing hydraulic fluid slip, which is consequently allowing the operating gates to drift from their specified height. The project includes, but is not limited to, the removal and replacement of the middle piston ring for each gate (three service, three emergency) and replacement with a new hydrolysis-resistant polyurethane piston seal manufactured to operate within the specified hydraulic fluid type, pressure, & temperatures. The Contractor shall note that only one gate at a time may be worked on until the repair work is complete. The outlet works are incorporated within the spillway and consist of three conduits located through the deep section of the spillway adjacent to the non-overflow section. Access to the gates is by a stairway from the equipment operating room and then through a gallery. Flow through each conduit is controlled by a hydraulically operated gate; additionally each gate is also equipped with a hydraulically operated emergency gate. All gates are operated by hydraulic pumps located in the equipment room. Flow through the conduit passes back into the natural river channel. During normal operation all gates are maintained at a 3-foot opening. Air vents are provided for both the service and emergency gates. There is an onsite 2-ton monorail hoist located in the operating room that will be available for use; however, the Contractor shall be required to provide an annual inspection certificate and conduct operational testing prior to use. Existing anchor points are located above the gate cylinders in the gallery. Similar to the monorail hoist, the Contractor shall be required to conduct operational testing prior to use. The gate chamber (gallery) is considered a Non-Permit Required Confined Space. If work execution in the gate chamber creates an atmospheric hazard, the gate chamber will be reclassified as a Permit-Required Confined Space. The magnitude of construction is between $100,000 and $250,000 This procurement is set-aside for small business vendors. The applicable NAICS code is 237990 with a Small Business Size Standard of $45 Million. ALL VENDORS MUST HAVE AN ACTIVE REGISTRATION IN SAM.GOV AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDERED. ANY VENDOR THAT DOES NOT HAVE AN ACTIVE SAM.GOV REGISTRATION WILL BE REJECTED AS NON RESPONSIVE. Please Direct Questions to Jennifer M. Samela at (978) 318-8324 or Jennifer.m.samela@usace.army.mil. Any Information Received at the Site Visit Which Conflicts With This Solicitation Should Be Brought to the Attention of Jennifer M. Samela. The Solicitation and Resulting Contract Shall Be the Governing Document in All Cases. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents