Similar Projects
Millikin University - School of Nursing Remodel
Build-out - 7,000 SF
Bidding
$3,000,000 CJ est. value
Decatur, IL 62522

2021 Faries Park Roadway
Alteration
Post-Bid
Decatur, IL 62526

Bus Barn Pavement
Infrastructure
Post-Bid
Argenta, IL 62501

Milling and resurfacing at 3 locations: 1) US 51 at IL 48; 2) I-72 at SN 058-0063/64; 3) US 51, 2 miles south of Maroa
Results
Maroa, IL

Bituminous Materials
Results
Macon, IL

Richland Community College - Ag Building Finish Out
Renovation - 12,000 SF
Construction
$3,761,778 CJ est. value
Decatur, IL 62521

A-O Grade School Pavement Rehabilitation
Infrastructure
Construction
$333,852 CJ est. value
Oreana, IL 62554

Asphalt Pad Sinawik Bid
Infrastructure
Post-Bid
Decatur, IL 62521

2021 Protection, Health, and Safety Project Implementation
Results
$230,000 to $250,000 est. value
Decatur, IL 62521

2021 Greenwood Cemetery Road Resurfacing
Infrastructure
Post-Bid
Decatur, IL 62522

Montessori Academy for Peace Site Work
Alteration
Results
$236,275 to $380,888 est. value
Decatur, IL 62521

Various City, County, Township, and Village Streets
Infrastructure
Post-Bid
$198,000 est. value
Decatur, IL

0.7 Miles of Patching, Milling, HMA Resurfacing and Longitudinal Joint Sealant
Infrastructure
Results
Decatur, IL

Resurfacing Various Streets
Infrastructure
Post-Bid
$500,000 est. value
Decatur, IL

18.7 Miles of Patching and a-2 Surface Treatment on Various Routes in Clay
Infrastructure
Results

Last Updated 10/07/2022 10:11 AM
Project Title

Millikin University Student-Athlete Facility

Physical Address View project details and contacts
City, State (County) Decatur, IL 62522   (Macon County)
Category(s) Education, Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Athletic Facility, College/University, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $6,700,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 7, 2022, this project is in planning. Information regarding a general contractor has not been disclosed. Construction is scheduled to begin in 2023.

Details

10,870 SF.
Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Earth Moving, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents