Similar Projects
Phase 1 - Tower Terrace Road W/O Barnsley to Alburnett Road Grading and Drainage
Conception
$4,400,000 est. value
Cedar Rapids, IA 52407

USACE UPRR Culverts CC
Conception
$5,000,000 est. value
Cedar Rapids, IA

Cedar Rapids Flood Risk Management Project
Term Contract
Design
$10,000,000 est. value
Cedar Rapids, IA

Bioretention Cells at DCSD and Davis Street Properties
Infrastructure
Bidding
$300,000 est. value
Bloomfield, IA

Pioneer Avenue SouthEast at Oakridge Drive Drainage Improvements
Infrastructure
Bidding
$110,000 est. value
Cedar Rapids, IA 52403

Camp Dodge S-05 Parking Lot and S-38 Drainage Improvements
Infrastructure
Post-Bid
Johnston, IA

Drainage District No. 12 Drainage Repairs
Infrastructure
Post-Bid
Bondurant, IA

Jesup Drainage Ditch
Results
$153,885 est. value
Jesup, IA

Cedar Lane Culvert Replacements
Results
$431,000 est. value
Waverly, IA

USACE McLoud Run LWR CC
Conception
$2,500,000 est. value
Cedar Rapids, IA

Water Reservoir Outer Wall Repair
Renovation
Bidding
$500,000 est. value
Maquoketa, IA

Wagaman Mill Retaining Wall Repairs
Infrastructure
Post-Bid
$250,000 to $350,000 est. value
Lynnville, IA 50153

Flood Control Levee Repair - 2021
Results
Dubuque, IA

Phase 3 - Tower Terrace Road from C Avenue to W/O Barnsley Lane Grading and Drainage
Conception
$2,100,000 est. value
Cedar Rapids, IA 52407

S-04 Drainage Improvements
Infrastructure
Bidding
$200,000 est. value
Johnston, IA 50131

Reported 04/28/2022 12:00 AM
Project Title

Storm Water Quality Improvements - Contract B

Physical Address View project details and contacts
City, State (County) Waukon, IA   (Allamakee County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Contract B includes two areas of permeable pavers, construction of a bioretention cell, and ditch grading and installation of rock check dams.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Erosion and Sedimentation Controls, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents