Similar Projects
Water: Raw Water Metering - 402-016 - City of Eau Claire
Renovation
Conception
$1,900,000 CJ est. value
Eau Claire, WI 54701

Water: Solar Electric Project - 402-013 - City of Eau Claire
Renovation
Conception
$1,210,000 CJ est. value
Eau Claire, WI 54701

Well 19 Iron/Manganese Filter - 10448 - City of Madison
Infrastructure
Design
$6,691,000 CJ est. value
Madison, WI 53705

Bernatello's Waste Water Treatment Plant
New Construction, Infrastructure - 3,375 SF
Design
$2,800,000 CJ est. value
Kaukauna, WI 54130

Wastewater Treatment Plant Upgrades
New Construction, Renovation, Infrastructure
Bidding
$800,000 CJ est. value
Thorp, WI 54771

Water Reclamation Facility
New Construction, Infrastructure
Bidding
$14,000,000 CJ est. value
Ixonia, WI 53036

WWTF Renovation
Renovation
Post-Bid
Hatley, WI 54440

Osmosis Plant at the Calumet County Park
New Construction
Post-Bid
Hilbert, WI 54129

2021 WWTF Upgrade
Results
Merrillan, WI

2021 WWTF Upgrade
Renovation
Results
Eagle River, WI 54521

Flood Pump Replacement - 404-013 - City of Eau Claire
Renovation
Conception
$300,000 CJ est. value
Eau Claire, WI 54703

Juneau Wastewater Treatment Facility Upgrade
New Construction, Infrastructure, Renovation
Bidding
$200,000 CJ est. value
Juneau, WI 53039

Dryer Indefinite Quantity Services
Term Contract
Post-Bid
Milwaukee, WI 53207

Dryer 1 Ring and Pinion Gear Replacement and Alignment at the Jones Island Water Reclamation Facility
Renovation
Results
Milwaukee, WI 53207

Sewer: Waste Water Treatment Plant Security System - 404-011 - City of Eau Claire
Renovation
Conception
$400,000 CJ est. value
Eau Claire, WI 54703

Last Updated 01/14/2023 07:32 AM
Project Title

Wastewater Treatment Facility Upgrades

Physical Address View project details and contacts
City, State (County) Random Lake, WI 53075   (Sheboygan County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $14,883,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of one new control building, one new fine screen, one new grit removal system, one new primary clarifier, three new activated sludge basins, one new final clarifier, one new belt filter press, two new blowers, one new generator, new pumps and motors, and all associated work at the existing WWTF. If there are any questions concerning this project plan, manual and specifications, Please Contact: Aaron Groh, P.E. @ 414-751-7200 agroh@kapurinc.com or Jonathan Butt, P.E. @ 414-755-1149 Jon.Butt@meadhunt.com The major facilities or components of the Project include, but are not limited to the following. To determine the full scope of the Project, refer to the entire Contract Documents: 1. Site civil modifications including new asphaltic concrete and pavement markings, concrete slabs, curb and gutter, site grading modifications, erosion control measures and birm installation, chain link fencing and concrete stairs with handrail. 2. Site lighting and installation of facility electronic access and camera systems. 3. Installation of new manholes, endwalls and buried sewer piping systems. 4. Installation of a new Control Building (structure 100) and associated equipment, facilities and yard piping/electrical systems. 5. Modification of existing Service Building (structure 200) including the following: Removal of existing rotating biological contactor systems (RBC). Removal and replacement of backup power generator system. Modification of the existing service building to repurpose the space with new overhead door and structural, architectural, HVAC and electrical upgrades. Furnish and install new blowers, pumping, piping, HVAC and electrical upgrades. Modification of existing chlorine contact channels into ultraviolet light (UV) disinfection process. 6. Installation of a new primary clarifier (structure 300). 7. Installation of new aeration basins, (structure 400). 8. Installation of a new final clarifier (structure 500). 9. Electrical and HVAC upgrades in sludge storage building (structure 600). 10. Aerobic digester system upgrades (structure 700). 11. Replacement sludge dewatering and polymer addition systems in the existing sludge dewatering building (structure 800). Electrical lighting and HVAC improvements in the building.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents