Similar Projects
Last Updated | 01/04/2022 05:00 AM |
Project Title | Boyette Reclaim Water Reservoir High Service Pump Station Upgrades |
Physical Address | View project details and contacts |
City, State (County) | Wesley Chapel, FL 33545 (Pasco County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $800,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work consists of modifying the existing Boyette Reclaimed Water Reservoir Pump Station. The work includes but is not limited to the replacement of the three existing five hundred (500) horsepower (HP)vertical turbine pumps with three new two hundred fifty (250) HP vertical turbine pumps, demolition of existing concrete pump bases and construction of new concrete pump bases, replacement of wiring from existing Variable Frequency Drive (VFD) to new pumps, replacement of existing motor disconnects miscellaneous other minor electrical modifications, modifications of two existing electrical manholes, and startup and testing located at 8102 Boyette Rd., Wesley Chapel, Florida 33545. |
||||||||||||||||||||||||||||||||||||||||||||||
Details | Lift and Pump Stations, Renovation.
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |