Similar Projects
Road Maintenance
Term Contract
Bidding
MN

Brooklyn Boulevard Trail
Bidding
$320,293 est. value
Brooklyn Center, MN 55430

Bituminous Paving of Vails Lake Road
Post-Bid
Paynesville, MN

Pedestrian Crossing and Bikeway Safety Improvements - REBID
Renovation
Post-Bid
Bloomington, Eden Prairie, Minneapolis, MN

CSAH 42/Akron Avenue Intersection Improvements
Results
Less than $2,700,000 est. value
Hastings, MN 55033

CSAH 22W and Members Parkway
Results
Rochester, MN

Bituminous Wear and Aggregate Surfacing
Bidding
MN

Annual Countywide Needs
Term Contract
Post-Bid
MN

2021 Micro Surfacing and Chip Seal
Results
Champlin, Independence, Maple Grove, Minnetrista, MN

Concrete Street Reconstruction
Bidding
Austin, MN

CSAH 5 (University Road) Mill, Bituminous Surface
Post-Bid
MN 55720

Grading, Bituminous Mill and Surfacing, ADA Improvements, Lighting, RRFB and Concrete Retaining Wall
Results
MN

Highway 36 and Manning Avenue Interchange
Bidding
MN

Paving
Post-Bid
MN

Grading, Full Depth Reclamation, Bituminous Mill and Resurfacing, Revise Signal System and Bridge No. 11X06 and 11X07
Results
MN

Last Updated 11/24/2020 12:06 AM
Project Title

Bituminous Milling and Surfacing, Ultrathin Bonded Wearing Course, and ADA Improvements

Physical Address View project details and contacts
City, State (County) MN   (Carver County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1006-31 (TH 25=025) STPF 1021(037) In Carver County on TH 25 from TH 5 to W JCT of CSAH 30/1st Bituminous Milling and Surfacing, Ultrathin Bonded Wearing Course, and ADA Improvements 5.797 Miles Grubbing 117 Tree,Common Embankment (Cv) 1848 Cy,Drill And Grout Reinforcement Bar (Epoxy Coated) 62 Each,18" Cs Safety Apron 26 Each,Concrete Curb And Gutter 168 Lf,Pedestrian Channelizer 72 Lf,Stabilized Construction Exit 1 Ls,Culvert End Controls 42 Each,Seed Mixture 25-121 319.7 Lb,Pavement Message Preform Thermoplastic Ground In 302 Sf,Crosswalk Preform Thermoplastic Ground In Enhanced Skid Resistance 288 Sf,Remove Sign Type c 6 Each,Remove Energy Absorbing Terminal 4 Each,Remove Concrete Walk 720 Sf,Bituminous Patching Mixture 60 Ton,15" Cs Pipe Culvert 82 Lf,18" Rc Pipe Culvert Design 3006 Class v 29 Lf,4" Tp Pipe Drain 30 Lf,Clean And Video Tape Pipe Sewer 117 Lf,Lining Culvert Pipe (18") Special 82 Lf,Concrete Walk 1684 Sf,Concrete Curb And Gutter Design b424 170 Lf,Traffic Barrier Design b8307 174 Lf,Traffic Control 1 Ls,Portable Changeable Message Sign 14 Uday,Maint And Restoration Of Haul Roads 1 Ls,Geotextile Fabric Special 1551 Sy,Excavation - Common 1528 Cy,Select Granular Embankment (Cv) 253 Cy,Mill Bituminous Pavement (Special) 90236 Sy,18" Cs Pipe Culvert 48 Lf,Clean Pipe Culvert 1664 Lf,Guide Post Type b 74 Each,Rolled Erosion Prevention Category 20 26244 Sy,Interim Pavement Marking 1 Ls,4" Broken Line Multi-Component Ground In (Wr) 5660 Lf,Mobilization 1 Ls,Clearing 4.2 Acre,Grubbing 4.2 Acre,Pavement Marking Removal 876 Sf,Remove Slotted Rail Terminal 4 Each,Sawing Bituminous Pavement (Full Depth) 189 Lf,Remove Pipe Culverts 80 Lf,Remove And Replace Bituminous Pavement 2586 Sf,Type Sp 12.5 Wearing Course Mixture (3,c) 624 Ton,15" Cs Safety Apron 36 Each,Video Tape Culvert 429 Lf,4" Precast Concrete Headwall 3 Each,Alternate Pedestrian Route 1 Ls,Sign Panels Type c 41 Sf,24" Solid Line Preform Thermo Ground In Esr 15 Lf,Field Laboratory Type Dx 1 Each,Clearing 117 Tree,Remove Metal Apron 34 Each,Remove Guardrail-Plate Beam 1110 Lf,Remove Bituminous Pavement 1130 Sy,Ultrathin Bonded Wearing Course 91414 Sy,12" Cs Safety Apron 12 Each,Truncated Domes 185 Sf,Mail Box Support 27 Each,End Treatment-Tangent Terminal 7 Each,Audible Message Device w Pushbutton & Locator Tone 84 Uday,Temporary Walkway Surface 920 Sf,Seeding 5.4 Acre,4" Double Solid Line Multi-Component Ground In (Wr) 1875 Lf,As Built 1 Ls,Pavement Marking Removal 90 Lf,Aggregate Base (Cv) Class 6 377 Cy,Traffic Barrier Design Type 31 1742 Lf,Erosion Control Supervisor 1 Ls,Storm Drain Inlet Protection 4 Each,4" Solid Line Multi-Component Ground In (Wr) 14249 Lf,Quality Management 1 Ls,Field Office Type d-Modified 1 Each,Aggregate Surfacing Class 2 2582 Ton,4" Perf Tp Pipe Drain 349 Lf,Temporary Pedestrian Ramp 2 Each,Temporary Fence 998 Lf,Weed Spray Mixture 3 Gal,6" Solid Line Multi-Component Ground In (Wr) 59783 Lf,Mobile Retroreflectometer Measurements 126040 Lf,Anchorage Assembly -Plate Beam 3 Each,Ditch Cleaning 969 Lf,Lining Culvert Pipe (24") Special 71 Lf,Sediment Control Log Type Compost 2883 Lf,Soil Bed Preparation 5.4 Acre,Fertilizer Type 3 1903 Lb,Weed Spraying 2.8 Acre,Removable Preformed Pavement Marking Tape 1506 Lf

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents