Similar Projects
Happytails Puppies
New Construction - 4,300 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Oak Ridge, NC 27310

Healing Paws Veterinary Hospital
New Construction - 5,610 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Hillsborough, NC 27278

PetSuites
Renovation - 11,299 SF
Bidding by Invitation
Charlotte, NC 28205

North Carolina Zoo Baboon Holding, African Pavilion Demo and Zoofari
Sub-Bidding
$6,875,000 est. value
Asheboro, NC 27203

Chatham County Animal Services
- 20,030 SF
Post-Bid
NC

Fort Fisher Aquarium - Asian Small-Clawed Otter Exhibit
Post-Bid
Kure Beach, NC 28449

Sycamore Building Greenhouse Patio Renovations
Renovation
Results
Less than $100,000 est. value
Asheville, NC

Construct Live Eagle Habitat for the Aquarium at Pine Knoll Shores
Results
Raleigh, NC

Paws & Claws Animal Hospital
New Construction - 9,950 SF
Construction
$1,300,000 est. value
Wilmington, NC 28410

New Granville County Law Enforcement and Detention Center and Animal Shelter
New Construction - 90,500 SF
Construction
Less than $25,980,676 est. value
Oxford, NC

Animal Urgent Care
New Construction, Demolition - 6,000 SF
Design
Fayetteville, NC

Greenhouse Re-Construction Project
Post-Bid
Fayetteville, NC 28301

San-Lee Park Bird Pens
Results
Sanford, NC

Bed & Bark Pet Care
New Construction - 8,260 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Waxhaw, NC

Animal Shelter Construction
Post-Bid
Manteo, NC 27954

Reported 03/19/2019 12:00 AM
Project Title

Steed Hall Greenhouse Renovations

Physical Address View project details and contacts
City, State (County) Pinehurst, NC   (Moore County)
Category(s) Animal/Plant/Fish Facility
Sub-Category(s) Animal/Plant/Fish Facility
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description 1. Controllers and Boards: Demo and remove existing equipment controllers and unused associated raceways. 2. Replace existing controls with thermostatic controls for Side vents and heating. Add dual stage thermostats to control exhaust fans. 3. Replace all rack and pinion arms and bearing assemblies for the wall vents. Replace hinge assemblies for wall vents 4. Replace all drive units for all wall vents - arms and motors. 5. Replace exhaust fan motors, belts, bearings and housings. Motors installed should be premium high-efficiency motors. 6. All equipment shall be UL listed and approved for use in greenhouse environment. 7. Inspect and repair or replace as needed, metal and/or glass. 8. Provide attic stock of actuators, thermostats, belts and any other parts deemed necessary.
Details
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 13 - Special Construction, Fabricated Engineered Structures, Glazed Structures, Greenhouses.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents