Similar Projects
Community Center - Town of Amherst
New Construction, Infrastructure
Conception
$8,010,000 CJ est. value
Amherst, NH 03031

Front Street Townhomes
New Construction, Infrastructure
Conception
$23,000,000 CJ est. value
Manchester, NH 03102

Manufacturing Building
New Construction, Renovation - 166,700 SF
Design
$10,000,000 CJ est. value
Merrimack, NH 03054

Thomas More College of Liberal Arts Campus Improvements
Renovation
Design
Merrimack, NH 03054

Lowell Road over First Brook Bridge (Bridge #116/080)
Infrastructure
Bidding
$50,000 CJ est. value
Hudson, NH 03051

Lowell Road over First Brook Bridge (Bridge #116/080)
Infrastructure
Bidding
$50,000 CJ est. value
Hudson, NH 03051

Annual Street Reconstruction Program
Term Contract
Post-Bid
Manchester, NH

Brookline - Paving
Infrastructure
Post-Bid
$840,000 est. value
Brookline, NH

2021 Paving Projects
Results
Hillsboro, NH 03244

2021 Paving
Infrastructure
Results
Brookline, NH

BAE Systems
Renovation
Construction
Manchester, NH

Sweeney Metal Fabricators, Inc.
Addition - 7,716 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Nashua, NH 03062

Aroma Joes / Hudson
New Construction, Infrastructure - 900 SF
Pending Verification
$270,000 CJ est. value
Hudson, NH 03051

Aroma Joes / Hudson
New Construction, Infrastructure - 900 SF
Pending Verification
$270,000 CJ est. value
Hudson, NH 03051

Canal/Franklin/Main Street Intersection Improvements - City of Nashua
Infrastructure
Conception
Nashua, NH

Last Updated 10/26/2022 02:34 PM
Project Title

Robinson Road Industrial Development

Physical Address View project details and contacts
City, State (County) Hudson, NH 03051   (Hillsborough County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $27,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of three industrial buildings with a total of 50,400 square feet of space. This project will be located at 199 and 201 Robinson Road. As of October 2022, this project is in final planning. No building permits have been submitted. Information regarding the selection of an architect and general contractor has not been provided. A firm timeline has not been established, however; construction is unlikely to begin prior to the first quarter 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

50,400 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents