Last Updated 02/25/2022 03:46 PM
Project Title

SWSP Segments B1 & B2

Physical Address View project details and contacts
City, State (County) TX   (Harris County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Contract is for construction of approximately 14,500 linear feet of 84-inch diameter and 40,000 linear feet of 96-inch diameter waterlines with all necessary valves and appurtenances, from west of Brittmoore Road to west of I-45. The proposed waterline installation will be primarily installed with Open-Cut construction methods. The tunnels will cross Harris County roads, TxDOT roads, Union Pacific Railroad, BSNF Railroad, Harris County Flood Control District (HCFCD) drainage systems, and private pipelines. Details of this work are provided in the Construction Drawings and Project Manual. This project is a part of the overall Surface Water Supply Project.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents