Similar Projects
Eastern Regional Water Supply Facility Operations and Laboratory Buildings Roof Replacement
Alteration
Bidding
$2,397,450 est. value
Orlando, FL 32825

Continuing HVAC Contracting Services at the Orlando International Airport, Orlando Executive Airport
Post-Bid
Orlando, FL 32827

Removal and Replacement of 75 A/C Rooftop Condensing Units at Maxwell Terrace Apartments - Building 1
Post-Bid
Orlando, FL 32805

City Hall Chiller Replacement, Maintenance and Service
Results
Apopka, FL 32703

Replacement In-Kind of one (1) - Sixty (60) Ton Chiller at the Pompano Turnpike Operations Center
Results
Ocoee, FL 34761

HVAC System Replacement, Roof Replacement, Supply and Install Solar Energy System at the OHA Executive Office
Post-Bid
Orlando, FL 32803

A/C Removal ATaS Lab NAWCTSD
Results
Orlando, FL 32826

Wolf Lake Middle School HVAC and Controls Upgrades
Post-Bid
$1,600,000 est. value
Orlando, FL 32800

Internal Operations Centre I (IOC I) Communications Room HVAC Improvements
Results
Less than $100,000 est. value
Orlando, FL 32801

Air Ductwork Cleaning Services
Post-Bid
Orlando, FL 32827

Data Center HVAC Preventive Maintenance and Repairs Services
Term Contract
Results
Orlando, FL 32827

N041--Sources Sought Notice Install Cooling Tower Gearbox
Post-Bid
Orlando, FL

Preventative Maintenance and Operations of Air Compressors and Dryers for the Orange County Convention Center
Term Contract
Results
FL

HVAC Maintenance and Small Projects
Term Contract
Post-Bid
Orlando, FL 32802

Correction Building HVAC Unit Replacement
Results
Less than $1,456,440 est. value
Orlando, FL 32839

Reported 06/11/2021 12:00 AM
Project Title

Wolf Lake Middle School HVAC and Controls Upgrades

Physical Address View project details and contacts
City, State (County) Apopka, FL 32712   (Orange County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager as Contractor (CMc)
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of demolition of the existing cooling towers, termination of chilled water piping to the adjacent elementary school, construction of CMU chiller enclosure, installation of new air-cooled chillers, renovation of the chemical treatment system, replacement of chilled water valves at all AHUs, replacement of VFDs, replacement of chilled water pumps, complete replacement of the entire BAS system, and a campus wide test and balance. LDB goal is 10% and Veteran Business Enterprise (VBE) is 3%.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents