Last Updated | 09/30/2022 10:08 AM |
Project Title | Aqueduct Stabilization at the Schoharie Crossing State Historic Site of Fort Hunter, Schoharie Crossing State Historic Site |
Physical Address | View project details and contacts |
City, State (County) | Fort Hunter, NY 12069 (Montgomery County) |
Category(s) | Entertainment/Recreation, Heavy and Highway |
Sub-Category(s) | Museum, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $1,276,500 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This General Construction project involves construction of a concrete thrust block below stream grade and providing additional support to Pier 6 through a system of underground strut and distribution beam. The thrust block will be supported on a series of micropiles. This project will stabilize Pier 6 and Arch 5, while not limiting future extension of the towpath across the Schoharie River at the Schoharie Crossing State Historic Site. Contractor shall physically complete Work of the Contract within Three Hundred (300) days after the Agreement is approved by the New York State Comptrollers Office. CR Number: 2088720 Each bid must be prepared and submitted in accordance with the Instructions to Bidders and must be accompanied by Bid Security in the form of a certified check, bank check, or bid bond in the amount of: General Construction Contract D005936 $54,725.00 Fifty-four Thousand, Seven Hundred Twenty-Five and 00/100 Dollars General Construction Aqueduct Stabilization; Refer to Section 01 1000 Summary of the Work Engineers Estimated Range: $943,500.00 - $1,276,500.00 Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 11% Women Owned Sub-Contracting Goal: 4% Service-Disabled Veteran-Owned Business Contracting Goal: 6% Contract term: 300 Days after contract approved by the NYS Comptrollers office. Project Specific Liquidated Damages (Refer to Article 14.10 of the General Conditions). $1,000.00 per Calendar Day The successful bidder will be required to furnish a Performance Bond and a Labor and Material Bond/Payment Bond in the statutory form of public bonds required by Sections 136 and 137 of the State Finance Law, each for 100% of the amount of the Contract. All Requests for Information (RFIs) are due by Friday, August 5, 2022, by 4:00 PM RFIs shall be submitted to: Elizabeth.Mastrianni@parks.ny.gov Bid modifications that are submitted in writing and signed by an authorized representative of the bidding firm will be considered for award if received by OPRHP prior to the scheduled proposal due date. Bids may be withdrawn or cancelled prior to the scheduled proposal due date. A bid may be rejected by OPRHP: if it shows any alteration of terms, conditions, or requirements; for any other irregularities; if it is incomplete, or if it offers an alternate bid not invited by the specifications. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |