Similar Projects
Last Updated | 12/10/2021 09:28 AM |
Project Title | Chemical Cleaning of Cell 3 Leachate Collection and Force Main System |
Physical Address | View project details and contacts |
City, State (County) | Georgetown, DE 19947 (Sussex County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sanitary Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | State Agency - 07/27/21 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project includes cleaning Cell 3 leachate collection lines and the force main system at the SSWMC. The work includes, but is not limited to: mobilize and demobilize the CONTRACTOR to and from the work area; provide labor, equipment, and supervision to perform the cleaning of all Cell 3 leachate collection pipes, collection sumps, and force main pipes; utilize analytical and technical means to design, monitor and adjust the Work; provide analysis of waste liquids and waste materials generated; and dispose of the collected liquids and cleaning materials used, prepared, or recovered during the Work. In addition, DSWA may require CONTRACTOR to dispose of these collected liquids and cleaning materials at another facility. A |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |