Similar Projects
Last Updated | 08/04/2022 04:11 PM |
Project Title | Ryle High School Pole Vault |
Physical Address | View project details and contacts |
City, State (County) | Union, KY 41091 (Boone County) |
Category(s) | Education, Heavy and Highway, Single Trades |
Sub-Category(s) | Equipment, Middle/Senior High School, Park/Playground, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected July 2022 |
Bids Due | View project details and contacts |
Estimated Value | $640,760 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Work of this Project is defined by the Contract Documents and includes, but is not limited to, a runway and two pole vault boxes at Ryle High School. Some minor fence relocation, sewer work, and grading are included. Project will be constructed under a single prime contract. All Sub-Bidders may view Bidding Documents at the locations listed in the Supplementary Instructions to Bidders or purchase them from ARC (513-326-2300). No Bidding Document will be mailed or packaged for pick up. Damage to Existing Conditions: Prior to commencement of operations the Contractor, along with the Owner and the Architect, shall examine existing conditions. Contractor shall videotape all conditions as a record of preconstruction condition. Contractor shall submit video with narration as to location to the Architect prior to construction. It shall be the responsibility of the Contractor to rectify any damage. Bidders must deposit with their Bids security in the amount, form, and subject to, the conditions provided in the Bidding Documents. Bid Security shall be made payable to the Owner, the Boone County Board of Education, as stipulated in the KDE Version of the Instructions to Bidders, and include Additive alternate Bids, if any. If the Bid Security is in the form of a Bid Bond the original only shall be submitted; no copies are necessary. The Contractor shall submit to the Owner and the Architect at the Preconstruction Conference his detailed Sequence of Operations outlining his proposed method of operation, location of temporary facilities, storage of materials, Contractor's parking etc., for the Owner's review and approval. The Owner retains final authority regarding the disposition of these functions. |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |