Similar Projects
Milham Park Improvements - cip0300068 - City of Kalamazoo
Infrastructure
Conception
$1,552,000 CJ est. value
Kalamazoo, MI 49001

Verburg Park Improvements - cip0300067 - City of Kalamazoo
Infrastructure
Conception
$473,000 CJ est. value
Kalamazoo, MI 49007

Airway Fun Center: Spinning Coaster
New Construction
Design
Portage, MI 49002

33rd Street Water Main - wat0500351 - City of Kalamazoo
Infrastructure
Design
$5,339,500 CJ est. value
Kalamazoo, MI 49048

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Bid Package #01 Landscaping and Fencing
Infrastructure
Post-Bid
$100,000 CJ est. value
Schoolcraft, MI 49087

Winter Maintenance Services
Infrastructure
Post-Bid
Kalamazoo, MI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Sidewalk Improvements (DDA North)
Alteration
Results
$891,886 est. value
Kalamazoo, MI

Kalexsyn: Addition
Addition - 2,040 SF
Pending Verification
Kalamazoo, MI 49008

Graphic Packaging International: Parking Lot Addition
Addition
Pending Verification
Kalamazoo, MI 49007

Cork (Portage to Sprinkle) - mst0100186 - City of Kalamazoo
Infrastructure
Conception
$3,859,000 CJ est. value
Kalamazoo, MI 49001

River's Edge Development
New Construction, Infrastructure
Design
$45,200,000 CJ est. value
Kalamazoo, MI 49007

Snowplowing and Snow Removal Services
Infrastructure
Post-Bid
Kalamazoo, MI

Lake Ottawa & Black River Campground Road Reconstruction
Term Contract
Results
$500,000 to $1,000,000 est. value

Last Updated 02/14/2023 03:03 PM
Project Title

2023 Local Streets Chip and Cape Seal

Physical Address View project details and contacts
City, State (County) Kalamazoo, MI 49007   (Kalamazoo County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $358,272 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work for this project shall consist of single chip seal of CST blended aggregate (1/4 nominally sized aggregate) and follow-on fog sealing of pavement or cape sealing of pavement using a single chip seal of 34CS or 29A blended aggregate (3/8" nominally sized aggregate) and follow-on micro-surface seal per Section 504 & 505 of the Michigan Department of Transportation Standard Specifications for Construction and the included provisions. Roads to be chip, cape, and fog sealed are listed in the bid documentation. Roads to be fog sealed shall have seal applied within 96 hours following the chip seal. Roads to be cape sealed shall have the micro-surface seal applied within seven (7) working days following the chip seal. The contract and work shall be carried out in conformance with the MDOT Standard Specifications for Construction, special provisions included in the contract documentation, and Ordinances of the City of Kalamazoo in effect on the date of invitation for bids. All necessary traffic control, labor, materials, tools, equipment, and other items incidental to the work being performed shall be included in the Contractor's unit price for this contract. Such items will not be bid or paid for separately but shall be included in the overall unit price. The bidder shall furnish all labor, supervision, supplies, tools, equipment, and other means necessary or proper for performing and completing the work. The bidder shall be responsible for the cleaning up of the job site and shall repair or restore all structures and property that may be damaged or disturbed during performance of the work to the satisfaction of the Public Services Department for the City of Kalamazoo. Drainage structure covers shall be salvaged and reused if in usable condition; otherwise, they shall be replaced. Where needed, all traffic control used for such operations as defined by the MMUTCD will be the responsibility of the bidder. The bidder shall have all work completed by September 1, 2023.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents