Similar Projects
Holt Fire Station
New Construction
Conception
$813,000 est. value
Holt, FL

Longwood Fire Station 15/Public Safety Facility
New Construction
Conception
Longwood, FL

New Police Facility
New Construction
Design
Tallahassee, FL

Fire Station 11
New Construction
Design
Orlando, FL

Fire Station 45 - Bunk Room Addition
Addition
Bidding
$1,500,000 est. value
Delray Beach, FL 33446

Fire Station No. 2
New Construction - 87,619 SF
Bidding
Fernandina Beach, FL 32034

Town of Windermere Town Facilities
New Construction - 9,882 SF
Post-Bid
$5,200,000 est. value
Windermere, FL

New Police Department
New Construction - 24,572 SF
Post-Bid
$8,200,000 est. value
Palmetto, FL 34221

Consultant Services for a New Police Headquarters
New Construction - 225,000 SF
Results
Fort Lauderdale, FL 33301

Construction Manager at Risk for the Austin Tindall Fire Station
Results
Kissimmee, FL 34741

Replace Fire Crash Rescue Station, 125th Fighter Wing, Jacksonville, FL
New Construction - 17,400 SF
Construction
$5,000,000 to $10,000,000 est. value
Jacksonville, FL 32218

Fire Training Center
New Construction - 14,000 SF
Construction
Lakeland, FL

Fire Station 17 and Community Resilience Center
New Construction
Conception
Tallahassee, FL 32310

Orlando Fire Station 6
New Construction
Design
Orlando, FL

Tyndall AFB Fire Station
New Construction
Bidding
Tyndall AFB, FL

Last Updated 10/25/2021 08:35 AM
Project Title

Hurricane Damage Repairs to Public Safety Building Fire Station 1

Physical Address View project details and contacts
City, State (County) Lynn Haven, FL   (Bay County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes: Remove and replace all high bay doors Remove and replace all high bay wall sheathing Remove and replace all wall girts Repair all damaged high bay columns Remove and replace all interior liner panels Remove and replace high eave overhang soffits, gutters, and downspouts Remove and replace high bay roof panels Add a concrete curb around the perimeter of the high bay exterior walls to protect the column and wall bases from being exposed to washdown and protect the integrity of the building columns and walls Remove and replace vinyl-faced roof insulation Coating existing exposed steel framing in the high bay to prevent rusting Improvements to the mechanical (heating equipment & ceiling fans), and electrical (all new led lighting) systems in the truck bays and entrance Installing new epoxy flooring and striping for all truck bays.

Details

Fire/Police Station, Renovation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents