Similar Projects
New Shackle Island Road and Old Drakes Creek Road Intersection- City of Hendersonville
Infrastructure
Conception
$2,200,000 CJ est. value
Hendersonville, TN 37075

Stormwater Projects- City of Hendersonville
Infrastructure
Conception
$5,971,871 CJ est. value
Hendersonville, TN 37075

Coles Ferry Road Duplex
New Construction
Design
$1,000,000 est. value
Gallatin, TN 37066

Lock 4 Development
New Construction
Design
$344,000,000 est. value
Gallatin, TN 37066

Dutch Bros Coffee #TN0105 / Hendersonville
New Construction, Infrastructure - 950 SF
Bidding
$290,000 CJ est. value
Hendersonville, TN 37075

Red River Court Infrastructure
New Construction
Post-Bid
Gallatin, TN 37066

Rugby Concession and Bathroom Sitework
New Construction, Infrastructure
Post-Bid
$463,312 CJ est. value
Hendersonville, TN 37075

Fire Station 5 Site and Drainage Improvements
Infrastructure
Results
Gallatin, TN 37066

Southern Force Main (Hester To Sage) Project
Infrastructure
Results
$989,836 CJ est. value
White House, TN 37188

Red River Road Townhomes
New Construction, Infrastructure
Construction
$32,000,000 CJ est. value
Gallatin, TN 37066

Red River Road Townhomes
New Construction, Infrastructure
Construction
$32,000,000 CJ est. value
Gallatin, TN 37066

Kensington Downs Phase 3
New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Gallatin, TN 37066

Staybridge Hotel
New Construction, Infrastructure - 71,876 SF
Pending Verification
$22,000,000 CJ est. value
Gallatin, TN 37066

Rugby Bathrooms- City of Hendersonville
Infrastructure
Conception
$500,000 CJ est. value
Hendersonville, TN 37075

St. Blaise Townhomes
New Construction
Design
$15,000,000 est. value
Gallatin, TN 37066

Last Updated 07/10/2023 11:08 AM
Project Title

Walnut Crest Townhomes

Physical Address View project details and contacts
City, State (County) Gallatin, TN 37066   (Sumner County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Multi-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $66,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of 175 townhome units across 43 buildings. As of July 2023, The project has received final approval from the city though it is unclear if those are the latest plans for the property. This project is in the early design stages, and is pending rezoning approvals from the City of Gallatin. An architect has been selected. Information regarding a general contractor has not been provided. A schedule for construction has not been set. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Apartments, 175 Unit(s).
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents