Similar Projects
Publix
New Construction - 45,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Myrtle Beach, SC

Former Piggly Wiggly
New Construction - 30,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Charleston, SC

Long Savannah - Master Plan
New Construction
Design
Charleston, SC

Harris Teeter
New Construction
Design
Fort Mill, SC

Murphy Express #8905
New Construction - 2,800 SF
Bidding by Invitation
Lexington, SC 29072

Murphy Express #8905
New Construction - 2,800 SF
Bidding by Invitation
Lexington, SC 29072

Murphy USA #6937
New Construction, Demolition - 1,400 SF
Sub-Bidding
Less than $500,000 CJ est. value
Sumter, SC 29150

Circle K #2706778
New Construction - 10,640 SF
Sub-Bidding
$1,000,000 to $5,000,000 CJ est. value
Fountain Inn, SC 29681

Parker's Kitchen #81
New Construction - 4,922 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Moncks Corner, SC 29461

Parker's Kitchen #81
New Construction - 4,922 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Moncks Corner, SC 29461

Infrastructure for Propane Fueling Station
Results
$20,000 to $60,000 est. value
Conway, SC

CDL Training and Propane Fueling Station
Results
Conway, SC 29526

Circle K #2720277
New Construction, Demolition - 8,664 SF
Construction
$464,508 est. value
Hilton Head Island, SC 29926

Circle K #2720277
New Construction, Demolition - 8,664 SF
Construction
$464,508 est. value
Hilton Head Island, SC 29926

Buc-ee`s
New Construction
Pending Verification
Florence, SC

Last Updated 02/10/2021 03:25 PM
Project Title

Parker's Kitchen #84

Physical Address View project details and contacts
City, State (County) Summerville, SC 29485   (Berkeley County)
Category(s) Commercial
Sub-Category(s) Gas Station, Supermarket/Convenience Store
Contracting Method
Project Status Construction Commenced fourth quarter 2020, Construction Nearing Completion
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Gas Station, 1 Supermarket/Convenience Store, 1 Story Above Grade, Approximately 4,920 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Foodservice Shelving, Food Dispensing Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines.
Division 12 - Furnishings, Countertops, Rugs and Mats, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Liquid Fuel Distribution, Gasoline Distribution, Gasoline Piping, Gasoline Pumps, Diesel Fuel Distribution, Diesel Fuel Piping, Diesel Fuel Pumps, Fuel-Storage Tanks, Underground Fuel-Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents