Similar Projects
Lakeland School Parking Lot Repairs
Infrastructure
Bidding
$30,000 est. value
Elkhorn, WI 53121

Lakeland School Parking Lot Repairs
Infrastructure
Bidding
$30,000 est. value
Elkhorn, WI 53121

Sharon Hall Aluminum Handicap Ramp
Post-Bid
Sharon, WI

2021 Seal Coating
Post-Bid
Delavan, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Lake Geneva - Kenosha, CTH O - STH 75, 236th Avenue - 125th Avenue
Results
Kenosha, Lake Geneva, WI

Road Maintenance and Construction Projects
Infrastructure
Bidding
$330,000 est. value
WI

2021 Joint and Crack Filling
Infrastructure
Post-Bid
Lake Geneva, WI

2021 Multi Use Trail
Results
East Troy, WI 53120

LRIP Project on Hazel Ridge Road, from Cobblestone Road to Kennel Road
Infrastructure
Bidding
$250,000 est. value
Elkhorn, WI 53121

2022 Street and Utility Improvements
Infrastructure
Post-Bid
Delavan, WI

Townline Road Reconditioning
Renovation
Results
WI

2022 Street Maintenance
Infrastructure
Bidding
$2,000,000 est. value
Whitewater, WI

Crack Filling Various Town Roads
Infrastructure
Post-Bid
Delavan, WI

S and D Townline Road Reconditioning
Results
WI

Last Updated 05/18/2022 02:35 AM
Project Title

2022 Paving Program

Physical Address View project details and contacts
City, State (County) Darien, WI 53114   (Walworth County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $280,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Includes two work sections, Jackson & N. 3rd Street and the Alleyway west of N. Wisconsin Street. In general the work consists of pulverizing asphaltic pavement, excavation, grading, base aggregate dense, manhole adjustments, removing and replacing concrete sidewalk access ramps, asphaltic pavement, and traffic and erosion control. Major work items and approximate quantities include: 3,200 square yards of pulverize asphaltic pavement, 500 tons of base aggregate dense, 780 tons of asphaltic pavement, 3 manhole adjustments, 35 linear feet of 12-inch diameter culvert pipe and endwalls, 400 square feet of concrete sidewalk, 65 square yards of concrete driveway approaches, and sawcutting pavement together with appurtenant construction, including traffic and erosion control.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents