Similar Projects
Midtown High-Rise Mixed-Use Development
New Construction
Conception
Phoenix, AZ 85012

West Valley BBQ
Build-Out
Conception
Gilbert, AZ 85295

Obon Sushi & Ramen
Build-Out
Design
Gilbert, AZ 85295

Ono Hawaiian BBQ
New Construction - 2,631 SF
Design
$1,000,000 est. value
Phoenix, AZ 85305

Robson Elementary Cooling Tower Replacement
Alteration
Bidding
$600,000 est. value
Mesa, AZ 85204

Phase 4 - Maintenance and Pool House
Post-Bid
Gila Bend, AZ 85337

Marriott Springhill Suites at Surprise Center
New Construction - 64,147 SF
Post-Bid
$5,000,000 est. value
Surprise, AZ 85374

Stadium Point at P83 - Master Developer
Results
Peoria, AZ

Stadium Point at P83 - Master Developer
Results
Peoria, AZ

Popeye's
New Construction - 3,227 SF
Construction
$500,000 to $1,000,000 CJ est. value
Mesa, AZ 85204

Riggs and Val Vista Retail
New Construction - 10,844 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Gilbert, AZ 85233

Astra Phoenix
New Construction - 2,005,000 SF
Pending Verification
$480,000,000 est. value
Phoenix, AZ 85003

Astra Phoenix
New Construction - 2,005,000 SF
Pending Verification
$480,000,000 est. value
Phoenix, AZ 85003

The Creek Cookies & Cream
Build-Out
Conception
Gilbert, AZ 85295

Bosa Donuts
Renovation - 2,000 SF
Design
Peoria, AZ 85381

Reported 07/01/2022 02:48 PM
Project Title

Curio by Hilton

Physical Address View project details and contacts
City, State (County) Scottsdale, AZ 85258   (Maricopa County)
Category(s) Commercial, Entertainment/Recreation
Sub-Category(s) Athletic Facility, Convention/Exhibit Center, Food/Beverage Service, Hotel/Motel, Swimming Pool(s)
Contracting Method
Project Status Construction Commenced June 2022, Construction Completion Expected December 2023
Bids Due View project details and contacts
Estimated Value Less than $24,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Major renovation in early summer 2022, that will take the number of rooms down from 326 to 278 casitas which will be combined to make the suites larger. The renovation will also include giving the pool a “whole resort atmosphere” and completely revamping the spa and fitness area. The hotel will remain open during the renovation.

Details

Hotel/Motel, Renovation, 278 Unit(s), 16 Acres, Convention/Exhibit Center, 90,000 SF Renovation, Food/Beverage Service, Renovation, Athletic Facility, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Underwater Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents