Project Title | Water Reclamation Facility Phase 2 Upgrades Project |
Physical Address | View project details and contacts |
City, State (County) | Yelm, WA 98597 (Thurston County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $32,998,602 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project shall consist of Schedule A - Liquid Process: Conversion of an existing Sequencing Batch Reactor (SBR,) water reclamation facility (WRF) to a new membrane bioreactor (MBR) WRY including all ancillary equipment needed to support the MBR, treatment system including but not limited to: Obtain and comply with permits; Partial demolition of SBR tanks, Blower equipment, pump station; Effluent Filters, lagoon equipment, power generators, chlorine contact. tank, Influent structure, Solids building equipment, and abandoning site pipe; Construction of Mechanical Electrical Building; MBE, tanks, Aeration tank walls, Headworks, Feed Forward Building, AMR CIP Building, Distribution structures, flow channels, Chemical Building, and Plant Drain Pump Station; Excavation, Paving and restoration; Supply and installation of headworks drum screens, gates and control panels; Supply and Installation of grit removal system with pump and classifier; Supply and installation of blowers; pumps, sanitary sewer piping, and supports; Supply and installation of MBE submerged membrane units (SMLTs) in MBR tanks; installation includes all piping, equipment and instruments provided by MBR manu-facturer; Stainless steel, ductile iron and other pipe supply and installation; Supply and installation of electrical MCCs, VFDs, instruments, duct banks, conduit, and PLC replacement; Supply and installation of standby generator with fuel tank and transform-er; Demolition and replacement of existing pipe, conduits; metal supports, and doors at the facility; Supply and. installation of HVAC systems and louvers. Schedule B - Solids Handling: Supply and install new centrifuge; polymer feed systems, controls, and conveyors: a biodryer constructed with expansion for second with up to three boilers, odor control, a 2,400-square foot weather enclosure, and ancillary equipment to produce an exceptional quality Class A Biosolid; and a new septage receiving station with screening, vii lying and metering, odor control; a storage tank, and pump station., Phase startup; temporary pipes/pumps and commissioning of facility equipment.; and other facility iinprovements and additions as shown on the Contract Draw ings. The Contractor shall substantially complete all work within 568 calendar days (Substantial Completion Date) and physically complete all work within 603 calendar days (Physical Completion Date). The bidder is urged to check the plans and contract provisions carefully. |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |