Similar Projects
Last Updated | 01/31/2023 06:11 PM |
Project Title | Satellite Village Family Development (MA 7-10) - Furnace and water Heater Replacement - GC |
Physical Address | View project details and contacts |
City, State (County) | New Bedford, MA 02745 (Bristol County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected February 2023 |
Bids Due | View project details and contacts |
Estimated Value | $848,288 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Satellite Village Family Development (MA 7-10) - Furnace & water Heater Replacement Contractor Qualification DCAMM Certificate All bidding Requests for Information (RFIs) shall be forwarded to Bowens@macritchie.net by 01/06/2023 at 5:00PM EST All bidding Requests for Information (RFIs) shall be forwarded to Bowens@macritchie.net by 01/06/2023 at 5:00PM EST for filed sub-bids and by 01/06/2023 at 5:00PM EST for general bids Plumbing work consists of: Replacement of (100) existing gas-fired wall-hung tankless domestic water heaters in kind as scheduled. Includes replacement of domestic cold water, hot water and condensate piping around water heater as required to adapt to new water heater. New concentric venting to be provided through attic space using existing penetrations. HVAC work consists of: Replacement of (16) existing gas-fired furnaces with new condensing type furnaces. Also includes installation of new Venting and Intake piping through attic spaces for gable end penetration with concentric fitting. This is a HUD funded project and is subject to Davis Bacon Wage Rates 1. Replacement of all existing gas-fired Water Heaters and Furnaces as scheduled within the Contract Document Drawings and specified within specifications. 2. Replacement of all existing water heater concentric venting with new as indicated in drawings. 3. Installation of new concentric venting for new furnaces as indicated in drawings. 4. Cutting, patching and painting to match existing of walls and soffits as necessary for installation. 5. Installation of new piping and sheet metal fittings as required to adapt new water heaters and furnaces to existing systems. 6. Balancing of air systems connected to furnace, balanced for comfort. Measure airflow before replacement and setting up new furnaces to provide same airflow as existing (as a minimum) and up to 20% over (as a maximum). 7. All work depicted within the Contract Document Drawings |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |