Similar Projects
Greys River Waterline Replacement
Infrastructure
Post-Bid
$400,000 est. value
Alpine, WY 83128

2021 McCollister Drive Water Main Replacement
Alteration
Post-Bid
Jackson, WY 83001

2021-26 South Jackson Area Snow Removal Project (6-21-M)
Term Contract, Infrastructure
Results
WY 83002

North Jackson Area Snow Removal Project (5-21-M)
Term Contract, Infrastructure
Results
WY

Afton Elementary Fire Loop Waterline 2021
Alteration
Post-Bid
Afton, WY 83110

North Wilson Area Snow Removal Project (7-21-M)
Term Contract, Infrastructure
Results

Tunnel #2 Cave-in Restoration
Alteration
Post-Bid
Torrington, WY

Gros Ventre Road Snow Removal Project (4-21-M)
Term Contract, Infrastructure
Results
Kelly, WY 83011

Owner`s Representative for the Horizontal Infrastructure and Site Planning and Development
Infrastructure
Post-Bid
Jackson, WY 83001

The Construction of 2021 Fall Street Patching Project
Infrastructure
Results
Jackson, WY 83002

Cottonwood Emergency Waterline Replacement
Infrastructure
Post-Bid
Edgerton, WY 82635

Leavitt Reservoir Expansion Project
New Construction, Infrastructure
Results
$40,000,000 to $50,000,000 est. value
Greybull, WY

WY NPD Yell 14(1) Lewis River Bridge
Term Contract
Post-Bid
Yellowstone National Park, WY

Bar Nunn Asphalt Improvements - Phase II
Alteration
Results
$293,832 est. value
Bar Nunn, WY

Uinta Meadows Elementary Drainage Improvement Project
Infrastructure
Post-Bid
Evanston, WY 82930

Last Updated 08/29/2022 11:03 PM
Project Title

2022 Double Chip Seal Project

Physical Address View project details and contacts
City, State (County) Pine Haven, WY 82721   (Crook County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $350,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes approximately 12,250 SY of gravel road preparation and double chip seal placement. Some ditch work is required to shape and prepare the roadway for proper drainage, and two existing culverts crossing one of the main roads will be replaced. Various Roads within the Town of Pine Haven, most are located at Southeast part of town The work shall be completed in full and ready for final payment prior to June 20, 2023.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents