Similar Projects
Maintenance, Service and Repairs HVAC and Boiler Systems
Alteration
Bidding
Westport, CT 06880

HVAC Services
Alteration
Bidding
Shelton, CT

HVAC and Mechanical Products
Term Contract
Post-Bid

045--Chilled Water Line Repair
Post-Bid
West Haven, CT 06516

Supplemental Cooling Upgrade for 911 Center
Results
Stamford, CT 06901

Cos Cob Design-Build (HVAC Replacement)
Results
$1,109,900 est. value
Cos Cob, CT 06807

K.T. Murphy School Toilet Exhaust Project for Stamford Public Schools
Post-Bid
Stamford, CT 06902

North Street School Gym Ductwork Modification
Results
$42,048 est. value
Greenwich, CT 06830

Cabinet Unit Ventilator Inspection Repair and Maintenance for Stamford Public Schools
Alteration
Post-Bid
Stamford, CT 06902

Auditorium AC Upgrade at Western Middle School
Results
$411,779 est. value
Greenwich, CT 06830

AHU-A1 Roof Top Unit Repairs for Stamford Public Schools
Alteration
Post-Bid
Stamford, CT 06902

Terry Conners Ice Rink Ammonia Leak Detection and Ventilation Upgrades
Results
Stamford, CT 06902

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Air Handler Unit 3 Renovation - Norwalk City Hall
Results
$80,000 est. value
Norwalk, CT

Woodland Apartments Boiler Replacement
Alteration
Post-Bid
Stamford, CT 06902

Reported 05/25/2022 12:00 AM
Project Title

Dust Collection System Upgrades and Related Work

Physical Address View project details and contacts
City, State (County) Greenwich, CT 06830   (Fairfield County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $165,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work is to include the removal of existing dust collection system, fan(s)/motor(s) and duct work and removal of the existing ceiling system. Providing a new Dust Collection System, that is to include individual mechanical equipment connections where applicable, workbench and floor sweeps. New lights and relocation of ceiling mounted items. Painting of the exposed ceiling structure, new concrete equipment pad and chain link fence. With an Alternate for roof top mechanical removals and a new Make-up Air System.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents