Similar Projects
Clark Convenience Store Fuel Station Single Family Apartment
New Construction, Renovation - 3,284 SF
Design
Less than $500,000 CJ est. value
Saint Charles, IL 60174

Clark Convenience Store Fuel Station Single Family Apartment
New Construction, Renovation - 3,284 SF
Design
Less than $500,000 CJ est. value
Saint Charles, IL 60174

Target Cafe #1323 Grocery Pickup
Renovation
Post-Bid
Saint Charles, IL 60174

Target Cafe #1896 Grocery Pickup
Renovation
Post-Bid
South Elgin, IL 60177

B.A.S.H. Burger and Sushi House
New Construction - 14,000 SF
Construction
Less than $3,060,000 est. value
Geneva, IL 60314

Thorntons Gas Station & Convenience Store
New Construction - 4,400 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Saint Charles, IL 60174

Thorntons Gas Station & Convenience Store
New Construction - 4,400 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Saint Charles, IL 60174

Regole Family Homestead
New Construction - 6,150 SF
Design
Less than $6,000,000 est. value
Saint Charles, IL 60174

Target Cafe #2177 Grocery Pickup
Renovation - 100 SF
Post-Bid
North Aurora, IL 60542

Octane 93 Brewery
Addition
Pending Verification
Saint Charles, IL 60174

BP Diesel Fueling Stations
Addition
Design
Elgin, IL 60123

Target #T1323 - Cafe Remodel
Renovation - 1,480 SF
Post-Bid
Saint Charles, IL 60174

The Hive Tavern and Eatery
Renovation
Pending Verification
Saint Charles, IL 60174

Burger King #2160
Renovation
Post-Bid
Montgomery, IL 60538

French Bakery
Build-Out
Pending Verification
Elgin, IL 60120

Reported 09/14/2021 04:28 PM
Project Title

Casey`s General Store

Physical Address View project details and contacts
City, State (County) Saint Charles, IL 60174   (Kane County)
Category(s) Commercial
Sub-Category(s) Food/Beverage Service, Gas Station, Supermarket/Convenience Store
Contracting Method Bids by Invitation.
Project Status Design Development, Construction Start Expected April 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Gas Station, Build-Out, Supermarket/Convenience Store, Addition, Food/Beverage Service, 4,000 SF Addition.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Liquid Fuel Distribution, Gasoline Distribution, Gasoline Piping, Gasoline Pumps, Diesel Fuel Distribution, Diesel Fuel Piping, Diesel Fuel Pumps, Fuel-Storage Tanks, Underground Fuel-Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents