Similar Projects
Right of Way - US059
Infrastructure
Conception
$7,000,000 CJ est. value
Stilwell, OK 74960

Right of Way - SH008
Infrastructure
Conception
$500,000 CJ est. value
Cherokee, OK 73728

New Performing Arts & College Career Center
New Construction
Design
$59,360,000 est. value
Yukon, OK

New Indoor Activity Center
New Construction
Design
$32,000,000 est. value
Yukon, OK

Emergency Traffic Signal for Mustang Fire Station No. 2
Infrastructure
Bidding
$200,000 CJ est. value
Mustang, OK 73064

RFQ - New Greenhouse/Processing Facility Construction
Renovation, Infrastructure
Bidding
$300,000 CJ est. value
Gracemont, OK 73042

Piedmont Middle School
New Construction
Post-Bid
$16,000,000 est. value
Piedmont, OK 73078

RFQ D/B - KC-46A 3-Bay Maintenance Hangar at Tinker AFB, Oklahoma
New Construction, Infrastructure
Post-Bid
$148,925,456 CJ est. value
Oklahoma City, OK 73145

Calumet Ag Barn and Locker Room Addition
Addition
Results
Calumet, OK

Maryetta Public School Cafeteria Building Additions
Addition
Results
Stilwell, OK

Stilwell Public Schools Classroom Addition
Addition, Demolition, Infrastructure
Construction
$497,300 CJ est. value
Stilwell, OK 74960

Stilwell Public Schools Classroom Addition
Addition, Demolition, Infrastructure
Construction
$497,300 CJ est. value
Stilwell, OK 74960

NW 10th @ The Stack
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Yukon, OK 73099

The Community at Surrey Plaza
New Construction, Infrastructure
Pending Verification
$9,000,000 CJ est. value
Oklahoma City, OK 73099

Utilities - SH008
Infrastructure
Conception
$500,000 CJ est. value
Cherokee, OK 73728

Last Updated 06/01/2023 03:36 PM
Project Title

The 2023 Gym and Auditorium Addition: Sulphur Public Schools

Physical Address View project details and contacts
City, State (County) Sulphur, OK 73086   (Murray County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $17,462,400 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of a 64,200 square foot gym and auditorium addition.

Details

64,200 SF.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents