Similar Projects
Olive Crossing Mixed Use Development
New Construction - 253,133 SF
Conception
$10,000,000 CJ est. value
Olivette, MO 63132

New Terminal
New Construction
Conception
$10,000,000 est. value
Saint Louis, MO

Shake Shack / Des Peres
New Construction, Infrastructure - 3,453 SF
Design
$1,000,000 CJ est. value
Des Peres, MO 63131

Logan University Fuhr Science Center
Addition, Demolition, Renovation, Infrastructure - 14,400 SF
Design
$28,000,000 CJ est. value
Chesterfield, MO 63017

New Ballwin Road Improvements
Infrastructure
Bidding
$900,000 CJ est. value
Ballwin, MO 63021

RFQ D/B - I-55 Corridor Improvements - Missouri Department of Transportation
Infrastructure
Bidding
$246,000,000 CJ est. value
Saint Louis, MO 63131

EOC/AOC Host Space Remodel - Phase I
Post-Bid
$190,000 est. value
Saint Louis, MO 63145

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

Terminal 1 Concourse C Gate Electrification for C15, C19 and C-23 - Phase III at St. Louis Lambert International Airport
Results
$1,278,000 est. value
Saint Louis, MO 63145

Structure Rehabilitation-Lambert International Boulevard Bridge over Cold Water Creek
Renovation
Results
$725,000 est. value
Saint Louis, MO

AC Hotel by Marriott
New Construction
Construction
Clayton, MO 63105

The McKenzie
New Construction, Infrastructure
Construction
$107,500,000 CJ est. value
Saint Louis, MO 63124

Residence Inn by Marriott
New Construction - 155,379 SF
Pending Verification
$10,000,000 CJ est. value
Clayton, MO 63105

West Adams Avenue Condominiums / Kirkwood
New Construction, Infrastructure - 8,817 SF
Pending Verification
$2,000,000 CJ est. value
Kirkwood, MO 63122

Lighthouse Point / North St. Louis Riverfront
New Construction, Infrastructure
Conception
$325,000,000 CJ est. value
Saint Louis, MO 63138

Last Updated 11/30/2022 01:05 PM
Project Title

Hampton Inn - Airport Location

Physical Address View project details and contacts
City, State (County) Saint Louis, MO 63134   (Saint Louis County)
Category(s) Commercial, Heavy and Highway, Transportation
Sub-Category(s) Airline/Passenger Terminal, Hotel/Motel, Site Development
Contracting Method Bids by Invitation
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $15,000,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

New 6-Story, 128 Room Hampton Inn attached to an existing Hilton hotel. Construction consist of 5 levels of wood over a concrete podium. Note from Midas Construction: Please contact Brian Moore at Midas to confirm your bid intent. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

6 Stories Above Grade, 65,800 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Seating, Hospitality Furniture.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents