Similar Projects
CHRL Pump Station 1A, 2 and 3
Infrastructure
Design
$630,000 est. value
WA

Alki Permanent Standby Generator
Alteration
Design
$6,000,000 est. value
WA

Auxiliary Utility Facility Generator Maintenance
Term Contract, Alteration
Bidding
Seattle, WA

HVAC Job Order Contracts Citywide
Alteration
Bidding
Renton, WA 98059

HVAC and Mechanical Products
Term Contract
Post-Bid

Tapteal 1 Pump Station Upgrade
Infrastructure
Post-Bid
Richland, WA 99352

Bellingham International Airport Replace Apron Lighting Project
Infrastructure
Results
Bellingham, WA 98225

Vehicle Gate Electrical Power
Alteration
Results
Vancouver, WA 98661

Chief Joseph Dam Freight and Passenger Elevator Replacement
Infrastructure
Design
$5,000,000 to $10,000,000 est. value
Bridgeport, WA 98813

Replace HVAC at Bow Hill Weigh Station
Alteration
Bidding
$344,000 to $380,000 est. value
Bow, WA 98232

Medina Pump Station MCC and Generator Replacement
Renovation, Alteration
Post-Bid
$2,300,000 est. value
Medina, WA 98039

Gooseberry Point Wastewater Treatment Plant Improvements
New Construction, Renovation, Infrastructure
Results
$13,000,000 to $14,500,000 est. value
Bellingham, WA 98226

Sources Sought Pump Replacement NRM CON-687-22-122 Well 1 and Well 2
Infrastructure
Design
$500,000 est. value
Walla Walla, WA 99362

Two (2) 60/80/100 MVA Autotransformers
Alteration
Bidding
Aberdeen, WA

HVAC and Air Filtration Systems
Renovation, Alteration
Post-Bid
Sunnyside, WA

Last Updated 06/09/2022 02:30 PM
Project Title

128Th St Booster Station And Generator

Physical Address View project details and contacts
City, State (County) State-Wide: WA
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Electric, HVAC, Pumps and Wells
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value $1,945,000 to $2,145,000
Plans Available from Construction Manager as Agent (CMa)
Owner View project details and contacts
Architect View project details and contacts
Description

Construct a new booster pump station including site work, site piping, new CMU building containing separate pump, chemical and generator rooms, skid mounted pump system, diesel generator and fuel storage, HVAC system, electrical power, control, and instrumentation.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents