Similar Projects
Last Updated | 03/11/2022 09:46 PM |
Project Title | US 23X From 13th Street to 18th Street and Streetscape |
Physical Address | View project details and contacts |
City, State (County) | Ashland, KY (Boyd County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | County - Boyd Route - US 23X Item No. - 9-480.00 & 9-244.00 Project Description - Reconstruction of US 23X from 13th Street to 18th Street and Streetscape of US 23X from 7th Street to 21st Street.The selected Consultant will be required to provide Preliminary and Final Roadway Design of US 23X from 13th Street to 18th Street, including the preparation of engineering studies, identifying any utility impacts, performing environmental services, performing drainage design, developing dependable cost estimates, conducting and preparing documents for public meetings. The selected Consultant will be required to provide Streetscaping and Landscaping Design for the corridor from 7th Street to 21st Street along Winchester Ave. The design will include selection of pavers, lighting fixtures, decorative features, and landscaping. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |