Similar Projects
Lower Valley Energy Workforce Housing
New Construction, Infrastructure
Conception
$8,000,000 CJ est. value
Jackson, WY 83001

Gregory Lane Complete Street/Drainage - Town of Jackson
Infrastructure
Conception
$1,650,000 CJ est. value
Jackson, WY 83001

Stilson Park Transit Center
New Construction
Design
$7,000,000 est. value
Teton Village, WY

Teton Science School Residential Development Phase I
Demolition, New Construction, Infrastructure
Design
$1,200,000 CJ est. value
Wilson, WY 83014

Miller Park Pedestrian Sidewalk and ADA Improvements Project
Infrastructure
Post-Bid
$500,000 CJ est. value
Jackson, WY 83001

Miller Park Pedestrian Sidewalk and ADA Improvements Project
Infrastructure
Post-Bid
$500,000 CJ est. value
Jackson, WY 83001

2022 East Pearl Sidewalk Project
Infrastructure
Results
Jackson, WY

Wilson Boat Ramp Improvement Project
Infrastructure, Renovation
Results
$992,399 CJ est. value
Jackson, WY 83001

East Karns Avenue Multi Residential
New Construction, Infrastructure
Construction
$2,100,000 CJ est. value
Jackson, WY 83001

AMK Ranch Seawall Improvements
Infrastructure
Construction
$496,578 CJ est. value
Moran, WY 83013

Snake River Bridge Replacement - Wyoming Department of Transportation
Infrastructure
Pending Verification
$28,800,000 CJ est. value
Jackson, WY 83001

East Kelly Avenue Housing Development
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Jackson, WY 83001

Center Street Pedestrian Improvements - Town of Jackson
Infrastructure
Conception
$250,000 est. value
Jackson, WY 83001

Teton Science School Residential Development Phase II
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Wilson, WY 83014

Wastewater Treatment Plant (WWTP) Phase IV Expansion
Addition, Demolition, Infrastructure, Renovation
Post-Bid
$13,576,000 CJ est. value
Teton Village, WY 83025

Last Updated 10/14/2023 10:03 AM
Project Title

Stilson Transit Center

Physical Address View project details and contacts
City, State (County) Wilson, WY 83014   (Teton County)
Category(s) Heavy and Highway, Transportation
Sub-Category(s) Misc. Structures, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $6,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a new transportation center. The new 2,526 square foot single story transit center structure is located at the intersection of highways 390 and 22, on Beckley Parkway. The building is sited in the middle of a new bus loop serving the visitors to Jackson Wyoming's premier ski slopes. The interior spaces consist of a large, heated waiting area, multi stall men's and women's toilets as well as gender neutral private toilet/dressing rooms. The mechanical and electrical equipment is housed in a ground level, enclosed utility room located in a discreet back of the building position. Est. Completion Date: Dec. 31, 2026

Details

2 Stories Above Grade, 2,526 SF.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Protective Covers, Transportation Stop Shelters.
Division 12 - Furnishings, Multiple Seating, Pews and Benches, Benches.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents