Similar Projects
Block-Cement and Asphalt Repair
Term Contract
Post-Bid
Charleston, SC 29402

Kiawah Island Parkway Improvement Project
Post-Bid
Kiawah Island, SC 29455

West 9th Street Roadway Improvements CTC
Results
North Charleston, SC

North Charleston 2019 Resurfacing Project
Results
Less than $1,717,313 est. value
North Charleston, SC

Rehabilitation - Charleston County
Results
SC

Preservation - US 521 Clarendon CO
Results
SC

Preservation - District 6
Results

Rehabilitation - Charleston County
Results
SC

Preservation - District 6
Results

Preservation - District 6
Results

District 6 Interstate Patching
Results

2019 Resurfacing Plan
Results
Mount Pleasant, SC 29464

Asphalt Drive
Results
Summerville, SC 29483

Palmetto Commerce Parkway at Patriot Boulevard Intersection Improvements TST
Results
North Charleston, SC 29405

Maybank Highway at River Road Intersection Improvements TST
Results
North Charleston, SC 29405

Last Updated 01/16/2020 07:48 AM
Project Title

Rehabilitation/Reconstruction - District 6

Physical Address View project details and contacts
City, State (County) (Charleston, Dorchester Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Construction Stakes, Lines & Grades 8.000 Ea Traffic Control 1.000 Ls Removal & Disposal Of Existing Pavement 16.000 Sy Unclassified Excavation 50.000 Cy Borrow Excavation 2,788.000 Cy Excavation For Shoulder Paving 190.100 Sta Hauling Of Excavated Shoulder Material 190.100 Sta Additional Rock For Full Depth Reclamation 145.000 Ton Cement Modified Recycled Base (10" Unif)-Curing Method b 29,427.199 Sy Portland Cement For Cement Modified Recycled Base Course 1,030.280 Ton Maintenance Stone 140.320 Ton Hot Mix Asphalt Base Course - Type a 950.400 Ton Liquid Asphalt Binder Pg64-22 1,772.197 Ton Full Depth Asph. Pav. Patching 6" Unif. 4,252.000 Sy Full Depth Asph. Pav. Patching 8" Unif 9,830.000 Sy Milling Existing Asphalt Pavement 1.5" 58,552.000 Sy Milling Existing Asphalt Pavement 2.0" 75,817.000 Sy Milling Existing Asphalt Pavement (Variable) 5,780.000 Sy Milled-In Rumble Strip 5.740 Mi Hot Mix Asphalt Intermediate Course Type b 11,240.654 Ton Hot Mix Asphalt Intermediate Course Type c 1,510.667 Ton Hot Mix Asphalt Surface Course Type b 14,026.726 Ton Hot Mix Asphalt Surface Course Type c 2,188.760 Ton Hot Mix Asphalt Surface Course Type d 2,061.900 Ton Driveway Paving-Surface Type c 791.875 Ton Driveway Paving-Surface Type d 499.750 Ton Permanent Construction Signs (Ground Mounted) 2,632.000 Sf 4" White Broken Lines(Gaps Excl.)Perm.Pvmt.Marking 6,296.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Perm.Pvmt.Marking 83,547.000 Lf 8" White Solid Lines Perm.Pvmt.Markings 1,840.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Perm.Pvmt.Marking 4,930.000 Lf White Single Arrows (Lt, Strght, Rt) Perm.Pvmt.Marking 49.000 Ea White Word Message "Only" -Perm.Pvmt.Marking 45.000 Ea 4" Yellow Broken Lines(Gaps Exc)Perm.Pvmt.Marking 3,670.000 Lf 4" Yellow Solid Lines(Pvt.Edge Lines) Perm.Pvmt.Marking 57,325.000 Lf 4" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 24,622.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 278,351.000 Lf 8"White Solid Lines(Crosswalk&Channelization)Fast Dry Paint 6,360.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 17,242.000 Lf White Single Arrow (Left, Straight, Right)-Fast Dry Paint 184.000 Ea White Word Message "Only"-Fast Dry Paint 170.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 11,010.000 Lf 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 233,203.000 Lf Permanent Clear Pavement Markers- Mono-Dir.- 4"x4" 665.000 Ea Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 649.000 Ea 4" White Broken Lines- (Gaps Excld) - Single Component Hybridized Polymer– 20 Mils 64.000 Lf 24" White Solid Lines-(Stop/Diagonal Lines)-Single Component Hybridized Polymer–20 Mils 331.000 Lf 4" Yellow Solid Lines (Pavement Edge & No Passing Zone) - Single Component Hybridized Polymer - 20 Mils 22,884.000 Lf Furnish & Install 1.0" Schedule 80 Pvc Conduit 500.000 Lf Furnish & Instl No. 14 Copper Wire,1-Conductor For Loop Wire 5,912.000 Lf Sawcut For Loop Detector 5,118.000 Lf Install Flush Mounted Wireless Sensor 56.000 Ea Remove Flush Mounted Wireless Sensor 56.000 Ea Adjust Catch Basin 2.000 Ea Adjust Drop Inlet Adjust d. i. 1.000 Ea Concrete Sidewalk(4" Uniform) 5.000 Sy Concrete Driveway(6" Uniform) 11.000 Sy Remove & Dispose Semi-Rigid Gr Device 264.000 Lf Mo350 w-Beam Strong Post System 106.000 Lf Mt3 Leading End Treatment Tl3 4.000 Ea Mo350 Tbbc Thrie Bridge Connector Tl3 4.000 Ea Permanent Grassing For Non-Permitted Resurfacing Projects 10.895 Acre Silt Fence 300.000 Lf

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents