Similar Projects
Maintenance and Service of Rink Refrigeration Systems
Post-Bid
Less than $1,500,000 est. value

Annual Maintenance and Service to HVAC and Plumbing systems at Various Flood Control/Navigational Facilities
Term Contract
Post-Bid
Less than $200,000 est. value
Boston, MA

Furnish and Install Mini Split AC Unit
Results
Boston, MA 02210

MIS Data Center Air Conditioning Units Replacement
Results
Less than $510,000 est. value
Boston, MA 02129

Boilers Annual Preventative Maintenance, Service Calls, Parts And Components
Post-Bid
Boston, MA

Construction: Hydronic Piping III at the O`Neill Federal Building in Boston
Results
$1,000,000 to $1,400,000 est. value
Boston, MA 02222

Computer Room A/C Replacement and Associated Work - General Bid
Post-Bid
Less than $200,000 est. value
Boston, MA

HVAC Maintenance and Service Repairs
Results
Less than $455,000 est. value
Boston, MA

HVAC Maintenance Contract
Term Contract
Post-Bid
Boston, MA

Detention Upgrades for the Falmouth District Court - Sub-Bids
Results
Less than $540,000 est. value
Boston, MA

HVAC Air Filters at Logan International Airport
Term Contract
Post-Bid
East Boston, MA 02128

Boiler Replacement and Associated Repairs at Donald McKay School and Josiah Quincy Elementary School - General Bid
Results
$2,873,158 est. value
Boston, MA

Goessmann Hall 2nd Floor Renovation Project - Filed Sub Bids
Post-Bid
Less than $11,200,000 est. value
Boston, MA 02108

Boiler Replacement and Associated Repairs at the Donald McKay Schooland Josiah Quincy Elementary School - Filed Sub-Bids
Results
$2,873,158 est. value
Boston, MA

Telecommunication Upgrades to Existing Communication Facilities - Filed Sub Bids
Post-Bid
Less than $1,600,000 est. value
Boston, MA 02120

Last Updated 12/12/2019 04:23 PM
Project Title

Heating System Closed Loop Treatment

Physical Address View project details and contacts
City, State (County) Boston, MA   (Suffolk County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor shall furnish all labor, transportation, equipment, materials, supplies, supervision and overhead necessary to provide monthly water testing and treatment of closed loop heating systems.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents