Similar Projects
Au Sable Forks Fire Station
New Construction, Infrastructure
Design
$100,000 CJ est. value
Au Sable Forks, NY 12912

Outdoor Classroom Pavilion Contract No - 2 - Site Work
New Construction, Infrastructure
Design
$17,240 CJ est. value
Schroon Lake, NY 12870

Mill Pond Drive Bridge Superstructure
New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Lake Placid, NY 12946

Mill Pond Drive Bridge Superstructure
New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Lake Placid, NY 12946

Cold Milling Work Order Contract
Term Contract, Infrastructure
Post-Bid

Olympic Center Revitalization Cooling Tower Piping Contract
Infrastructure, Alteration
Post-Bid
$1,200,000 est. value
Lake Placid, NY 12946

Mirror Lake Drive Sidewalk, Drainage & Pavement Improvements
Results
Less than $1,600,000 est. value
Lake Placid, NY 12946

Precast Concrete Bridge
New Construction
Results
Elizabethtown, NY

Craigardan Campus
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Elizabethtown, NY 12932

Asphalt Paving At 8 LNA Sites
Term Contract
Post-Bid

Tracy Road Over New Pond Bridge Construction
Results
North Hudson, NY

Moriah Sewer Collection System Upgrades
Infrastructure
Post-Bid
$3,900,000 CJ est. value
Moriah, NY 12960

I-87 Resurfacing and Rustic Rail replacement from Exit 26 to Exit 28
Results
Chester, NY

North Elba Town Hall Exterior Evaluation and Rehabilitation
Infrastructure
Post-Bid
$370,000 CJ est. value
Lake Placid, NY 12946

Asphalt Milling
Term Contract
Results
NY

Last Updated 08/22/2022 06:01 AM
Project Title

Bridge Deck Replacement Northbound (Exit 32) Off Ramp Over Spruce Mill Brook & Rustic Rail Replacement

Physical Address View project details and contacts
City, State (County) Chesterfield, NY 12950   (Essex County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $6,384,978 [brand] Estimate
Plans Available from Civil Engineer - 07/20/22
Owner View project details and contacts
Architect View project details and contacts
Description

87I 1211 1424, 1811.41, 1810.27 Estimated Total: $1,513,258.96 D264838, PIN 172255, FA Proj Y001-1722-553, Essex Co., I-87 EXIT 32 NB OFF RAMP BRIDGE REHABILITATION & I-87 RUSTIC BRIDGE RAIL REPLACEMENT, Towns of Chesterfield and Lewis, Bid Deposit: 5% of Bid (~ $200,000.00). Repairs to the northbound off ramp of Exit 32 on Interstate 87 in the Town of Lewis and repairs to the Interstate 87 bridges over Ausable River in the Town of Chesterfield. Essex County. The current status of the project is In Development. The Bid Opening is expected to be in Summer 2022. Construction is expected to begin in Fall 2022. Construction is expected to be completed in Fall 2023. This project is located in the CAPITAL DISTRICT region and includes the following: Counties CLINTON ESSEX Every bid must be accompanied by a bid bond, certified check or bank cashier's check payable to the NYS Department of Transportation, in the sum of the amount shown on the proposal title page. Bonds must be on form CONR 391. Electronic bids must include an electronic bid bond. Project related technical questions or comments must be submitted through the Construction Contracting section of the NYSDOT Business Center on the NYSDOT website Contract administration or procurement questions may be submitted either through the website or directed to Robert Kitchen, or the Assistant Director/Director of the Office of Contract Management, (518) 457-2124. Please call (518) 457-2124 if a reasonable accommodation is needed to participate in the Letting. Federally Aided Contracts identify a DBE Goal, and 100% NY State Funded Contracts identify MBE, WBE, and SDVOB Goals. Contracts with 0% Goals are generally single operation contracts, where sub-contracting is not expected, and smaller size contracts -- both of which may present direct bidding opportunities for Small Business Firms, including, but not limited to, DBE, MBE, WBE or SDVOB. NYSDOT - I-87 Exit 32 Nb Off Ramp Bridge Rehabilitation and I-87 Rustic Bridge Rail Replacement

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents