Similar Projects
Japanese House Addition - Ogura - Sato Annex
Addition - 6,250 SF
Conception
$3,350,000 est. value
Urbana, IL 61802

Swine Center Upgrade
Renovation
Conception
$18,000,000 est. value
Champaign, IL 61822

Library Expansion
Renovation, Addition - 28,000 SF
Design
Mahomet, IL

RFQ Construction Manager - Additions, Renovations and New Facilities
Addition, Demolition, New Construction, Renovation, Infrastructure
Design
$420,000 CJ est. value
Mahomet, IL 61853

Exterior Renovations Altgeld Hall
Renovation
Bidding
$13,000,000 CJ est. value
Urbana, IL 61801

Illini Hall Demolition - Phase 1
Demolition, Infrastructure
Bidding
$2,000,000 CJ est. value
Champaign, IL 61820

UIUC Research Park Developer Selection Zone 1 & 2 RFP
New Construction - 60,000 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Urbana, IL 61801

South Mahomet Road Utility Extensions
Post-Bid
Mahomet, IL 61853

Professional Services For Japan House Addition - Ogura - Sato Annex
Addition - 6,250 SF
Results
Less than $3,350,000 est. value
Urbana, IL 61802

Ubben Basketball Complex Expansion BP1
Addition
Results
Champaign, IL 61820

Ubben Basketball Complex Expansion BP 2
Addition
Construction
Champaign, IL 61820

Ubben Basketball Complex Expansion Bid Package 3
Addition
Construction
Champaign, IL 61820

Modernize and Restructure the Urbana-Champaign Campus Library - University of Illinois
Renovation, Infrastructure
Pending Verification
$54,000,000 CJ est. value
Urbana, IL 61801

Modernize and Restructure the Urbana-Champaign Campus Library - University of Illinois
Renovation, Infrastructure
Pending Verification
$54,000,000 CJ est. value
Urbana, IL 61801

Swine Research Center Modernization
New Construction - 10,000 SF
Conception
$12,600,000 est. value
Champaign, IL 61822

Last Updated 08/30/2022 03:02 PM
Project Title

High Density Storage Addition Undergraduate Library / University of Illinois-Urbana-Champaign

Physical Address View project details and contacts
City, State (County) Champaign, IL 61820   (Champaign County)
Category(s) Education, Government/Public, Heavy and Highway
Sub-Category(s) College/University, Library - Public, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $54,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 30, 2022, an architect has been selected and this project is in the final planning phase. It is anticipated bidding phase will start in February 2023, with a contractor award made by May 31, 2023. A firm timeline for start of construction has not been determined. *The closed solicitation has been included below for reference: Plans call for the High-Density Storage (HDS) Addition will be the first step in a multi-phased project to reconstruct the Main and Undergraduate Libraries. This addition to be located on the west end of the existing 6th stack will be a large climate-controlled vault capable of storing 1.5 million volumes in an 11,000 square foot footprint. The total area of the HDS Addition with the associated mechanical room is approximately 23,000 square foot. As part of this project, a new utility tunnel will be constructed to connect the existing Main Library Power Plant to the West Sixth Street steam tunnel and the new HDS Addition. Also part of this project will be the construction of a new Lecture Hall 66, a building addition to the southwest side of the Main Library. A new mechanical room will be constructed to house the mechanical and electrical systems to serve the HDS. The mechanical room roof will be designed to support new cooling towers that will replace the current cooling towers on the roof of the stacks. This project will construct the new cooling towers and demolish those currently existing on the roof of the stack area. Interior renovation work in the existing Main Library Building as part of this project will consist of a 3,600 square foot renovation of the main north/south corridor on the first floor, a 3,300 square foot renovation of the Grand Stair located between the north/south corridor and the Marshall Gallery and a renovation of the mechanical systems serving the existing 11,600 square foot Delivery Room on the 2nd floor. This project is part of State of Illinois Board of Higher Education Fiscal year 2020 Budget Recommendations. It is currently unknown what approvals have been obtained. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Roof and Deck Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Library Stack Systems, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Furniture, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Study Carrels, Index Card File Cabinets, Multiple Seating, Portable Audience Seating, Seat and Table Assemblies.
Division 13 - Special Construction.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment, Central HVAC Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents