Similar Projects
Lower Riley Creek WLA Reductions - SW-7250-09 - City of Eden Prairie
Infrastructure
Conception
$800,000 CJ est. value
Eden Prairie, MN 55347

Birch Island Dredging and Inlet Modification - SW-7250-10 - City of Eden Prairie
Infrastructure
Conception
$450,000 CJ est. value
Eden Prairie, MN 55346

Lead Abatement Lhc20-1
Infrastructure
Post-Bid
Minneapolis, MN 55407

Lead Abatement Bid Packet # 2
Term Contract, Infrastructure
Post-Bid
$40,000 CJ est. value
Minneapolis, MN 55415

Library Mechanical Rooms Asbestos Abatement
Alteration
Results
$80,000 est. value
Bloomington, MN 55431

Asbestos Abatement for MPHA Family Housing Expansion
Alteration
Results
$40,000 est. value
Minneapolis, MN

Lead Abatement Bid Packet 4
Alteration
Post-Bid
$40,000 est. value
Minneapolis, MN 55407

2023 Baggage Claim/Ticket Lobby Operational Improvements P1
Renovation, Infrastructure
Results
$35,496,215 CJ est. value
Saint Paul, MN 55111

2022 Crack Seal Project
Infrastructure
Post-Bid
$200,000 CJ est. value
Deephaven, MN 55391

Scattered Sites Siding Project
Renovation
Post-Bid
$300,000 CJ est. value
Minneapolis, MN 55415

City of Minneapolis Hiawatha Public Works - Phase 2 Demolition
Demolition, Infrastructure
Post-Bid
$30,000 CJ est. value
Minneapolis, MN 55404

HLTH-Lead Abatement Bid Packet #6
Term Contract, Infrastructure
Post-Bid
$40,000 CJ est. value
Minneapolis, MN 55415

HLTH-Lead Abatement Bid Packet #7
Term Contract, Infrastructure
Post-Bid
$40,000 CJ est. value
Minneapolis, MN 55407

Rebid HLTH-Lead Abatement Bid Packet 8
Term Contract, Infrastructure
Post-Bid
$100,000 CJ est. value
Minneapolis, MN 55412

HLTH-Lead Abatement Bid Packet 9
Term Contract, Infrastructure
Post-Bid
$50,000 CJ est. value
Minneapolis, MN 55418

Last Updated 07/10/2023 03:14 PM
Project Title

Tree Removal and Disposal and Stump Grinding and Disposal

Physical Address View project details and contacts
City, State (County) Minneapolis, MN 55415   (Hennepin County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

When applicable, the contractor must comply with prevailing wage laws on City construction and development projects. For contracts greater than or equal to $50,000, contractors and subcontractors may be required to submit Certified Payroll Reports, via any software systems specified by MDCR. The City reserves the sole and exclusive right, in accordance with all applicable law, to reject all or any part of any bid, waive informalities, defects, irregularities, variances, technicalities, and award the contract to the lowest responsive and responsible bidder(s) to best serve the interest of MPRB. Informality shall mean a minor defect or variation of a bid from the exact requirements of the specifications which does not affect the price, quality, quantity, or delivery schedule for the goods, services or construction being procured. Contractor must possess a current Minneapolis Tree Service business license at all times throughout the term of this agreement in order to perform tree removal work. Submit a copy of your Minneapolis Tree Services License with your bid. This requirement does not apply to stump-grinding that does not include tree removal Contractor must employ one or more Certified Arborists4 (CA) on a full-time basis throughout the duration of this agreement. Submit evidence that you meet this requirement. Contractors who employ multiple CAs need only submit one certificate. This requirement does not apply to stump-grinding that does not include tree removal Contractors who provide stump grinding without tree removal must meet the license, certification and registration requirements of their local jurisdiction, but are not required to obtain a Tree Services License or employ a Certified Arborist. A tree removal on private property is assigned when a property owner requests an MPRB contractor to remove a condemned tree, or they fail to act to remove a tree within specified time limits. Tree removal shall include topping and other operations necessary in removing assigned trees to ground level. It shall further include hauling and disposing of all wood and debris, peeling the bark to the ground of any remaining elm stumps that are higher than 4”and peeling the bark to the ground or girdling any remaining ash stumps higher than 12”. The contractor is responsible for disposal of debris removal, and related costs, in compliance with all state and local regulations.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents