Similar Projects
EOC AV Upgrade
Term Contract
Bidding
Hanscom A F B, MA

Intercom Upgrades at O'Connor Heights
Alteration
Bidding
$9,840 est. value
North Andover, MA 01845

Security Camera Installation Maintenance and Replacement Services
Post-Bid
Bedford, Worcester, MA 01730

Security Camera Installation Maintenance and Replacement Services
Post-Bid
Bedford, Worcester, MA 01730

Force Protection Site Security System Solutions (FPS4) Final Request for Proposal (RFP)
Results
$700,000,000 est. value

Force Protection Site Security System Solutions (FPS4) Final Request for Proposal (RFP)
Results
$700,000,000 est. value

Verizon Wireless Tower
Pending Verification
Shrewsbury, MA

Single Point Video Detection (SPVD) Traffic Signal Camera System
Post-Bid
Wilmington, MA 01887

WLAN Installation
Results
Bedford, MA 01731

Supply and Install Outdoor Scoreboards
Post-Bid
Less than $100,000 est. value
Lawrence, MA

National Physical Security (NPSP) Maintenance and Installation
Results
Less than $29,000,000 est. value

Access Control Upgrades
Post-Bid
$120,000 est. value
Milford, MA

N--NETWORK CABLING INSTALL - 761
Results
Chelmsford, MA 081243610

Approximately 36 Floor Core Devices Wired
Post-Bid
Less than $60,000 est. value
Worcester, MA

Annual Maintenance Plan- Surveillance System, Perimeter Alarm, & Drop Arms
Results
Natick, MA

Last Updated 08/25/2021 09:20 AM
Project Title

Installation of an Intelligent Transportation System (ITS) Consisting of 2 Closed Circuit Television Cameras (CCTV)

Physical Address View project details and contacts
City, State (County) (Essex, Middlesex, Worcester Counties)
Category(s) Single Trades
Sub-Category(s) Security/Communications
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,778,500
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

"1.000","Ls","Schedule of Operations - Fixed Price $9000","100." "1.000","Ls","as-built Survey and Plans","100.9" "12.000","Hr","Tree Trimming - Tree and Stump Removal Crew","102.001" "60.000","Cy","Test Pit for Exploration","141.1" "25.000","Cy","Class B Rock Excavation","144." "1.000","Ls","Environmental Health and Safety Program","180.01" "40.000","Hr","Personal Protection Level C Upgrade","180.02" "35.000","Hr","Licensed Site Professional Services","180.03" "5.000","Ton","Disposal of Unregulated Soil","181.11" "10.000","Ton","Disposal of Regulated Soil - in-state Facility","181.12" "5.000","Ton","Disposal of Regulated Soil - Out-of-state Facility","181.13" "5.000","Ton","Disposal of Hazardous Waste","181.14" "225.000","Ft","Drive Sample Boring","191." "30.000","Ft","Hollow Stem Auger Borings","191.10" "30.000","Ft","Core Boring","191.11" "30.000","Ft","Chain Link Fence Removed and Reset","666." "10.000","Ea","Silt Sack","697.1" "24.000","Mo","Engineers Field Office and Equipment (Type a)","740." "1.000","Ls","Mobilization","748." "1560.000","Ft","Sediment Control Barrier","767.121" "900.000","Sy","Jute Mesh","767.9" "605.000","Ft","2 Inch Conduit Type Nm - Plastic -(Ul)","804.21" "640.000","Ft","3 Inch Conduit Type Nm - Plastic -(Ul)","804.31" "380.000","Ft","1-1/2 Inch Electrical Conduit Type Rm - Galvanized Steel","806.15" "955.000","Ft","2 Inch Electrical Conduit Type Rm - Galvanized Steel","806.2" "40.000","Ft","3 Inch Electrical Conduit Type Rm - Galvanized Steel","806.3" "11.000","Ea","Electric Handhole - Sd2.023","811.23" "7.000","Ea","Communication Handhole - Sd2.023","811.231" "4.000","Ea","Break Into Existing Pullbox - Handhole - Manhole","811.351" "2.000","Ea","Junction Box 24 X 24 X 10 Inches","811.87" "2015.000","Ft","24 Strand Single Mode Fiber Optic Cable","813.251" "1.000","Ls","Power Service Connection – 90eb-vms/cctv-87.6","813.801" "1.000","Ls","Power Service Connection – 90wb-vms/cctv-98.1 & 90wb-rwis-98.1","813.802" "1.000","Ls","Power Service Connection – 90eb-vms-105.0 & 90eb-rwis-105.0","813.803" "1.000","Ls","Power Service Connection – 90eb-vms-113.8 & 90wb-vms-113.8","813.804" "4.000","Ea","Signal Post and Base Standard - 8 Foot","817.10" "2.000","Ea","Ip Cctv Camera - Ptz Type","819.22" "9.000","Ea","Grounding, Transient Voltage Surge and Lightning Protection","819.231" "4.000","Ea","Fiber Optic Ethernet Switch","819.741" "4.000","Ea","24 Position - Fiber Optic Patch Panel","819.742" "4.000","Ea","Remote Power Manager","819.743" "1.000","Ls","Network and System Configuration","819.751" "1.000","Ls","Field Site and Integrated Systems Testing","819.752" "1.000","Ls","Its Equipment Training","819.753" "1.000","Ls","Operations and Maintenance","819.754" "1.000","Ls","Prototype Integration Testing","819.755" "2.000","Ea","Co-located Road Weather Information System (Rwis)","819.909" "5.000","Ea","Variable Message Sign (Vms), Controller and Pole Mounted Cabinet","824.611" "1.000","Ea","Overhead Guide Sign Supports Removed and Discarded","828.31" "1.000","Ea","Overhead Guide Sign Removed and Relocated","828.32" "1.000","Ls","Supports for Overhead Vms 90eb-vms/cctv-87.6","840.311" "1.000","Ls","Supports for Overhead Vms 90wb-vms/cctv-98.1","840.312" "1.000","Ls","Supports for Overhead Vms 90eb-vms-105.0","840.313" "1.000","Ls","Supports for Overhead Vms 90eb-vms-113.8 & 90wb-vms-113.8","840.314" "175.000","Day","Traffic Cones for Traffic Management","851.1" "1050.000","Sf","Safety Signing for Traffic Management","852." "120.000","Ft","Temporary Pedestrian Barricade","852.11" "2.000","Ea","Temporary Pedestrian Curb Ramp","852.12" "3.000","Ea","Portable Breakaway Barricade Type Iii","853.1" "370.000","Day","Truck Mounted Attenuator","853.403" "110.000","Day","Temporary Illumination for Work Zone","853.8" "650.000","Day","Temporary Portable Rumble Strip","854.6" "200.000","Day","Arrow Board","856." "310.000","Day","Portable Changeable Message Sign","856.12" "3000.000","Day","Reflectorized Drum","859." "330.000","Day","Reflectorized Drums With Sequential Flashing Warning Lights","859.1" "2.000","Ea","Traffic Sign Removed and Reset","874.2"

Details

Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents