Similar Projects
Naval Submarine Base Kings Bay Maintenance Dredging 44, 45, and 47-Foot Project Camden County, Georgia
Infrastructure
Sub-Bidding
$25,000,000 CJ est. value
Saint Marys, GA 31558

FY23 Savannah Inner Harbor Dredging
Infrastructure
Sub-Bidding
$100,000,000 CJ est. value
Savannah, GA 31401

Provide Water Quality Analytical Services
Term Contract
Post-Bid
GA

Environmental Support Services
Infrastructure
Post-Bid

Southside Trail (SST) Soil Remediation
Infrastructure
Results
Atlanta, GA

Asbestos Abatement Services
Alteration
Results
GA

Demolition of Structures
Demolition, Infrastructure
Sub-Bidding
$70,000 CJ est. value
Albany, GA 31701

Pre-Demolition Asbestos Survey
Demolition, Infrastructure
Post-Bid
Homerville, GA 31634

Demolition and Asbestos Abatement of Structures at 2123 Parkwood Road
Demolition, Alteration
Results
$10,800 est. value
Snellville, GA 30078

(ESPLOST) Demolition of Garden City Athletic Complex and Groves Annex Building
Demolition, Infrastructure
Sub-Bidding
$200,000 CJ est. value
Savannah, GA 31401

Abatement and Demolition Services
Addition, Demolition
Post-Bid
GA

Asbestos Abatement, Demolition and Debris Removal - Annual Contract
Term Contract
Results
South Fulton, GA

Demolition and Removal Services
Term Contract, Demolition, Infrastructure
Sub-Bidding
$50,000 CJ est. value
Atlanta, GA 30329

Pre-Demolition Asbestos Survey
Alteration
Post-Bid
Milledgeville, GA 31062

Demolition of Building
Demolition, Infrastructure
Results
$45,000 CJ est. value
East Ellijay, GA 30540

Last Updated 03/31/2023 09:16 AM
Project Title

Old Altama Elementary School Phase 1 Demolition and Asbestos Abatement

Physical Address View project details and contacts
City, State (County) Brunswick, GA 31525   (Glynn County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $41,731 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 31, 2023. The project has been awarded with the amount of $41,731.11. Old Altama Elementary School Phase 1 Demolition and Asbestos Abatement The work will consist of Phase 1 Demolition work which includes Selective Demolition to: 1. Remove ceiling tile and cabinets to expose areas to identify materials suspected of containing asbestos; 2. Sampling and testing materials to determine if asbestos materials are present and: 3. Removing all asbestos materials inside and outside the building. Previous sampling has identified 9x9 vinyl asbestos floor tile, asbestos containing pipe insulation and exterior asbestos panels installed into window systems. Proposals must be submitted in duplicate accompanied by a Bid Bond not less than five percent (5%) of the Base Proposal. No proposal may be withdrawn for a period of thirty (30) days after time has been called on the date of the opening. If proposal is $100,000.00 or more both a Performance and Labor and Materials Payment Bond will be required in an amount equal to one hundred percent (100%) of the Contract Price. The Owner reserves the right to reject any and all proposals and to waive technicalities and formalities, and to award the contract in the best interest of the Owner. The Owner will evaluate each proposal and make a final rating of the evaluation factors and make a contract award decision prior to disclosing the contents of the proposals. Please direct all questions to Debi Vest of John A. Tuten & Assoc. Architects, via email at debiv@johntuten.com .

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents