Similar Projects
RFQ Engineering - CRA Transportation Engineering and Design Services For North/south Connectors
Infrastructure
Conception
$2,000,000 CJ est. value
Panama City Beach, FL 32407

RFQ Design - Frank Brown Park Community Center Annex - Safe Room
New Construction, Infrastructure - 15,600 SF
Conception
$4,400,000 CJ est. value
Panama City Beach, FL 32413

Emergency Contractor List
New Construction, Infrastructure
Design
Panama City, FL 32403

Emergency Contractor List
New Construction, Infrastructure
Design
Panama City, FL 32403

RFQ - Continuing Professional Services Contract
Term Contract
Bidding
Panama City, FL 32401

RFQ - Continuing Professional Services Contract
Term Contract
Bidding
Panama City, FL 32401

Architecture and Engineering Design Service
New Construction
Post-Bid
Panama City, FL

Architecture and Engineering Design Service
New Construction
Post-Bid
Panama City, FL

Multimedia Environmental Compliance Engineering Support for Navy, Marine Corps, and other DOD Installations, and Federal Agencies
Results
Norfolk, VA

Multimedia Environmental Compliance Engineering Support for Navy, Marine Corps, and other DOD Installations, and Federal Agencies
Results
Norfolk, VA

RFQ - Professional Services Contract for Panama City-Continuing Basis
Term Contract
Bidding
Panama City, FL 32401

RFQ Engineering - Bay Memorial Walking Park / Garden Club
Infrastructure
Post-Bid
$300,000 CJ est. value
Panama City, FL 32401

Ancillary Structures Inspection Consultant
Infrastructure
Results
$5,000,000 est. value

RFQ - Professional Services for Panama City State Revolving Fund (SRF) Projects - General Engineer(S) - Continuing Basis
Term Contract
Bidding
Panama City, FL 32401

Environmental Monitoring Assessment & Consulting Services
Term Contract
Post-Bid

Last Updated 10/11/2023 09:19 AM
Project Title

RFQ Design - A/E Design Services - Public Works Building Safe Room and Generator

Physical Address View project details and contacts
City, State (County) Panama City Beach, FL 32413   (Bay County)
Category(s) Professional Services
Sub-Category(s) Architectural, Engineering
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $650,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Panama City Beach (the City), under the provisions of Section 287.055, Florida Statutes (the Consultant's Competitive Negotiation Act), hereby gives notice that a Request for Qualifications for professional services is invited from qualified architectural and engineering firms or teams to provide architectural and engineering design services related to the construction of retrofit activities at the existing Public Works Building which will serve as a safe room for hurricanes and/or tornado events. The building is located at 200 N Gulf Blvd Panama City Beach, FL 32413. Provide planning, design, and construction administration services for construction of retrofit activities for the public works building at 200 N. Gulf Blvd to serve as a safe room of City employees during hurricane and tornado events. The northern portion of the existing structure will be retrofit to strengthen the roof and wall systems, as necessary, and the installation of new opening protection. The project shall be designed to meet the criteria contained in the standards of the Department of Homeland Security, Federal Emergency Management Agency guidance manual P-361, Design and Construction for Community Safe Room, to provide near-absolute protection to occupants during and after extreme weather events. Minimum design wind speed will be 200 mph. A significant percentage of this project is being funded with Hazard Mitigation Grant Program (HMGP) grant funds and the A/E firm will be subject to all related compliance matters during the course of the project. The City envisions entering into one Agreement for Services with the successful firm or team, with specific task authorizations for proposed design and construction administration services components being negotiated and approved by the City on an as-needed basis. The City is under no obligation, either express or implied, to contract for design or construction of any of the proposed components. Authorized design tasks may also include site work, including without limitation, utility services, drainage, stormwater attenuation and treatment, access, landscaping, irrigation and signage, and additional parking where required. Provide planning, design, and construction administration services for construction of retrofit activities for the public works building at 200 N. Gulf Blvd to serve as a safe room of City employees during hurricane and tornado events. The northern portion of the existing structure will be retrofit to strengthen the roof and wall systems, as necessary, and the installation of new opening protection. The project shall be designed to meet the criteria contained in the standards of the Department of Homeland Security, Federal Emergency Management Agency guidance manual P-361, Design and Construction for Community Safe Room, to provide near-absolute protection to occupants during and after extreme weather events. Minimum design wind speed will be 200 mph. A significant percentage of this project is being funded with Hazard Mitigation Grant Program (HMGP) grant funds and the A/E firm will be subject to all related compliance matters during the course of the project. The City envisions entering into one Agreement for Services with the successful firm or team, with specific task authorizations for proposed design and construction administration services components being negotiated and approved by the City on an as-needed basis. The City is under no obligation, either express or implied, to contract for design or construction of any of the proposed components. Authorized design tasks may also include site work, including without limitation, utility services, drainage, stormwater attenuation and treatment, access, landscaping, irrigation and signage, and additional parking where required. The method of Contractor Selection has not been Determined at this time

Details

Division 01 - General Requirements.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 11 - Equipment.
Division 13 - Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.
Division 27 - Communications.
Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents