Similar Projects
Lucky Star Wind Farm
New Construction, Infrastructure
Conception
$650,000,000 CJ est. value
Medicine Bow, WY 82329

Street Reconstruction - Pierce/Curtis Intersection - MCW-CP24-010 - City of Laramie
Infrastructure
Conception
$485,000 CJ est. value
Laramie, WY 82070

Two Rivers North Wind Farm
New Construction, Infrastructure
Design
$540,000,000 CJ est. value
Medicine Bow, WY 82329

Laramie Valley Chapel
Demolition, New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Laramie, WY 82070

Leavitt Reservoir Expansion Project
Infrastructure
Bidding
$69,000,000 CJ est. value
Greybull, WY 82426

PRV Replacement
Infrastructure
Bidding
$300,000 CJ est. value
Laramie, WY 82070

Campbell County Memorial Hospital - Pathology Lab
Renovation - 1,200 SF
Post-Bid
$280,000 est. value
Gillette, WY 82716

Annual Trenching and Boring Services
Term Contract
Post-Bid
Gillette, WY

Reynolds Sanitary Sewer - Phase 2
Infrastructure
Results
$543,826 CJ est. value
Laramie, WY 82072

North Tank and Pipeline Project
Infrastructure
Results
$18,148,591 CJ est. value
Laramie, WY 82070

University of Wyoming Halls and Dining - Subcontractors and Suppliers
New Construction, Infrastructure, Renovation
Construction
$170,000,000 CJ est. value
Laramie, WY 82070

U-Haul of Gillette
New Construction, Infrastructure - 38,264 SF
Pending Verification
$4,000,000 CJ est. value
Gillette, WY 82718

TransWest Express Transmission Project
New Construction, Infrastructure
Pending Verification
$3,000,000,000 CJ est. value
Rawlins, WY 82301

Street Rehabilitation - Joanna Bruner - MCW-CP24-011 - City of Laramie
Infrastructure
Conception
$780,000 CJ est. value
Laramie, WY 82072

University of Wyoming Ivinson Parking Garage Project
New Construction, Infrastructure - 12,000 SF
Design
$2,000,000 CJ est. value
Laramie, WY 82071

Last Updated 06/06/2023 05:20 AM
Project Title

Memorial Hospital of Sweetwater County Laboratory Renovations and Addition

Physical Address View project details and contacts
City, State (County) Rock Springs, WY 82901   (Sweetwater County)
Category(s) Heavy and Highway, Laboratory
Sub-Category(s) Laboratory, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

https://www.sweetwaternow.com/sweetwater-memorial-asks-commissioners-to-support-lab-remodel-for-specific-purpose-tax-project/ After some discussion, the Memorial Hospital of Sweetwater County (MHSC) Board of Trustees decided to draft a letter to the Sweetwater County Commissioners explaining why they have selected remodeling the lab for their specific purpose tax project. The letter will also ask for the commissioners' support. During the MHSC meeting yesterday afternoon, the trustees voted unanimously to write a letter to the commissioners justifying why they are requesting to remodel the lab as its specific purpose tax. Chairman Taylor Jones said that during a recent commission meeting some concern as to whether or not the lab project would be considered a basic infrastructure project was brought to light. Jones said he spoke to a couple of commissioners about it after their last meeting to find out what the hospital could do. "With a county this size and the population we have, I firmly believe that our hospital is basic infrastructure..." Jones said. When all of the people passing through the county along Interstate 80 are included, he believes that only adds to it being a basic infrastructure. With this in mind, Jones said he considered whether the lab itself would fall under basic infrastructure. "I'm not a medical professional, but I do know that we can't hardly do anything in our hospital without a fully functioning lab," Jones said. Last year, the lab had about 76,000 visits and about 560,000 tests were completed. Jones came to the conclusion that the lab is a basic infrastructure not only to the hospital, but the county as well. According to Jones, one of the county commissioners requested a letter from the board explaining its stance on the lab being selected as the hospital's specific purpose tax project. The board could pick other projects to be placed on the ballot, such as replacing the windows or redoing the parking lots, he explained, however, he doesn't feel that would be in the best interest of the public. Trustee Ed Tardoni said while the hospital is getting the tests done, they are using the foundation's office as a temporary lab, which the patients liked. However, all of those test samples then have to be physically walked over to the main lab for testing. The current lab's waiting area is insufficient to meet the needs like the temporary lab can. Trustee Kandi Pendleton asked if there were other funding options the hospital could pursue to remodel the lab. MHSC CEO Irene Richardson said they have applied for a State Loan and Investment Board (SLIB) grant, through the state. However, the last time she checked, they wanted a one-to-one match, meaning if the project would cost $6.5 million, the hospital would need to pay for half of it. Richardson said she didn't know if the county would help cover the cost of half of that project. Richardson also said applying for the grant doesn't guarantee they will receive the grant. Sweetwater County Commissioner Jeff Smith said SLIB grants are really competitive and some of the funding are only for COVID-19 related projects. In addition, he said the application process is extensive. As for lists of specific purpose projects, there are $113 million in requests and the commission would like to stay in the $85 million range. The county's $21 million project list, which currently includes the hospital's lab remodel, is less than the City of Rock Springs' $41 million project list the City of Green River's $34 million project list. "I am in support of it and the hospital," Smith said. As for the label of whether or not is infrastructure doesn't matter as much to him and the importance of the project, Smith clarified. Trustee Marty Kelsey said he looked up the definition of infrastructure and based on that definition there is no doubt that the lab remodel is an infrastructure project. "I'd like to see it go forward," he said. Trustee Barbara Sowada echoed what the rest of the board discussed saying she would like the lab remodel to remain as the hospital's specific purpose project. After this discussion, the board voted unanimously to write a letter to the county commission explaining why they selected the lab as their project and asking them for their support. _____________________________________________________________________________________________________________________________________________________________________ As of March 2021, project has been postponed until further notice. General description of the work consists of approximately 3,575 square feet of lab addition, and 1,075 square feet of existing lab renovation. Work includes all trades, including but no limited to, demolition, flooring, framing, painting, cabinetry, finishes, ceiling, lighting, electrical, HVAC, fire protection, and site work as required to complete the scope in full. Additional Description: The work is anticipated to occur in two phases and will be awarded under a single CMAR Contract.

Details

,, 4,650 SF - 3,575 SF. 1,075 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings, Doors and Frames, Windows, Vents.
Division 09 - Finishes, Tiling, Flooring, Resilient Flooring, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Institutional Furniture, Laboratory Furniture.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Fans, Central HVAC Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents